Proposed solar farms in Bradford County, PA

Planning records show 7 solar farms and solar energy projects in Bradford County, PA since 2024 (big campuses often file each phase separately, and each filing counts here). 7 are still moving through the process: 3 proposed or in review and 4 approved or permitted. Together they propose 67 acres. The newest, Vato Solar project, Springfield Township in Springfield Township, was filed October 20, 2026.

7projects and phases filed since 2024
7still in the process
67acres still in the process
–est. value still in the process

Ground-mounted solar farms cover dozens or hundreds of acres, often farmland, and connect to the power grid through new equipment.

Circle size reflects project size. Updated November 24, 2026.

The biggest

Filed 2026-10-20
Other
Other
Permitted
Vato Solar project, Springfield Township
Springfield Township, Bradford County, PA
Filed 2026-10-20
Other
Other
In review
PAL 112 solar facility, Orwell Township
Orwell Township, Bradford County, PA
Filed 2026-07-31
Other
Other
In review
100.5 MW solar facility across four townships
Burlington Township; Franklin Township; Monroe Township; Towanda Township, Bradford County, PA
Filed 2026-05-19
Other
42 acres|Other
Approved
Four-array solar project, Wysox Township
Wysox Township, Bradford County, PA
Filed 2026-02-10
Other
Other
Permitted
3 MW solar facility, Sheshequin Township
Sheshequin Township, Bradford County, PA
Filed 2025-12-31
Other
Other
In review
3 MW solar facility, Canton Township
Canton Township, Bradford County, PA

Every solar project filed since 2024

How this list is made

It includes projects described as a solar farm, solar energy facility, photovoltaic array or community solar (rooftop panels on homes and businesses are left out), from public county, municipal and state planning and permit records, checked every day. Sizes are what the filings state, and construction values are rough estimates. A project refiled under the same case number counts once, but separately filed phases of one campus each count. See all trackers or upcoming public meetings.