[Trackers](https://plannednearby.com/topics/) · [Solar farms](https://plannednearby.com/topics/solar-farms/) · [Pennsylvania](https://plannednearby.com/topics/solar-farms/pa) · Wayne County

# Proposed solar farms in Wayne County, PA

Planning records show 3 solar farms and solar energy projects in Wayne County, PA since 2024 (big campuses often file each phase separately, and each filing counts here). 3 are still moving through the process: 3 approved or permitted. The newest, Texas Solar 1 in Texas Township, was filed August 18, 2025.

**3** — projects and phases filed since 2024

**3** — still in the process

**0.0M** — sq ft still in the process

– — est. value still in the process

Ground-mounted solar farms cover dozens or hundreds of acres, often farmland, and connect to the power grid through new equipment.

Circle size reflects project size. Updated November 24, 2026.

## The biggest

- [Filed 2025-08-18 · Industrial · Industrial · Permitted · Texas Solar 1 · Texas Township, Wayne County, PA](https://plannednearby.com/x/dep-882404)
- [Filed 2025-01-21 · Industrial · Industrial · Permitted · Cochecton Turnpike Solar Project · Damascus Township, Wayne County, PA](https://plannednearby.com/x/dep-877412)
- [Filed 2024-09-10 · Industrial · Industrial · Permitted · 10 Funaro Court Solar · Damascus Township, Wayne County, PA](https://plannednearby.com/x/dep-875050)

## Every solar project filed since 2024

| Received | Project | Town | Type | Stage | Homes | Sq ft |
| --- | --- | --- | --- | --- | --- | --- |
| 2025-08-18 | [Texas Solar 1](https://plannednearby.com/x/dep-882404) | [Texas Township](https://plannednearby.com/c/wayne-pa/texas-township) | Industrial | Permitted |  |  |
| 2025-01-21 | [Cochecton Turnpike Solar Project](https://plannednearby.com/x/dep-877412) | [Damascus Township](https://plannednearby.com/c/wayne-pa/damascus-township) | Industrial | Permitted |  |  |
| 2024-09-10 | [10 Funaro Court Solar](https://plannednearby.com/x/dep-875050) | [Damascus Township](https://plannednearby.com/c/wayne-pa/damascus-township) | Industrial | Permitted |  |  |

## How this list is made

It includes projects described as a solar farm, solar energy facility, photovoltaic array or community solar (rooftop panels on homes and businesses are left out), from public county, municipal and state planning and permit records, checked every day. Sizes are what the filings state, and construction values are rough estimates. A project refiled under the same case number counts once, but separately filed phases of one campus each count. See [all trackers](https://plannednearby.com/topics/) or [upcoming public meetings](https://plannednearby.com/hearings/).

---

Source page: https://plannednearby.com/topics/solar-farms/wayne-pa

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
