Monastery buildings and stormwater management

Hamiltonban Township, PA · institutional

In short: Monastery buildings and stormwater management is an institutional project in Hamiltonban Township, Adams County, PA. As of November 24, 2026, it is approved. Latest record: Official record (liberty.adamscountypa.gov): Liberty supervisors conditionally approved the plan on April 1, 2025; revised plan dated 05/19/26 listed for… (April 1, 2025). What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Approved Official record (liberty.adamscountypa.gov): Liberty supervisors conditionally approved the plan on April 1, 2025; revised plan dated 05/19/26 listed for conditional approval June 3, 2026 · Apr 1, 2025 · source
  1. Proposed
  2. In reviewFeb 2024
  3. ApprovedApr 2025
  4. Permitted
  5. Under construction
  6. Completed

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

About this project

Proposes new buildings and stormwater management for the Monastery of Jesus, Mary, and Joseph in Hamiltonban Township. The agenda does not give building size or current site conditions.

Plan type
Subdivision/land development plan (type not stated)
Land use
institutional

Project history

  • 2024-02-21 · #2024-02-monastery-buildings-and-stormwater-manag · Subdivision/land development plan (type not stated)

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 8, 2026

The Carmel of Jesus, Mary and Joseph, a community of cloistered Carmelite nuns, is building a new monastery on Water Street near Fairfield. Plans cover new buildings and the stormwater system, which handles rain runoff. The land straddles Hamiltonban and Liberty Townships, so both reviewed the plan.

The county record stops in February 2024, but the project has moved well past that. Liberty Township supervisors conditionally approved the land development plan in April 2025, and a revised plan was on their June 2026 agenda. News coverage from September 2026 says construction is under way and about 20% done. The oratory (a small chapel) was dedicated in 2024. Most work happens behind the enclosure walls.

The reported budget is about $100 million, with about $22 million raised. The community expects 12 to 15 more years of building. Coverage describes the monastery as on the smaller side, built with traditional stone and timber methods.

What it could mean nearby

Where it stands

Liberty Township conditionally approved the plan in April 2025, and a revised plan was listed for approval on June 3, 2026. The outcome of that vote and any final Hamiltonban approval were not found. Building is already under way at the site, so the remaining approvals probably cover later phases. Note: County records show no activity after February 2024, but township agendas show later plan revisions and an April 2025 conditional approval, and news reports show building is well under way.

Who's behind it

Carmel of Jesus, Mary and Joseph (Discalced Carmelite nuns), Fairfield · A cloistered Catholic community that bought the land in 2012 and is building its monastery in stages with traditional methods.

Around the web

Planning terms explained
Land development plan
A formal site plan a township reviews before new buildings and related site work can proceed.
Conditional approval
Approval granted on the condition that listed items are fixed or completed later.
Stormwater management
Features such as basins and pipes that control rain runoff so it does not flood neighbors.
Oratory
A small chapel used for prayer and worship.

Researched by AI from public sources on Nov 8, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: Liberty Township supervisors and Hamiltonban Township supervisors decide the plan, and residents can comment at their public meetings.

In Pennsylvania, Hamiltonban Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Hamiltonban Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.