Adams County · East Berlin Borough · #2024-05-industrial-building-addition-224-east-ki
Industrial building addition, 224 East King St
224 East King St, East Berlin Borough, PA · industrial
In short: Industrial building addition, 224 East King St is an industrial development in East Berlin Borough, Adams County, PA. As of November 24, 2026, the public records we track show nothing newer since May 15, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
A proposed building addition to an existing industrial and manufacturing facility at 224 East King St in East Berlin Borough. The agenda does not give the addition's size.
- Plan type
- SLD submission (stage not stated)
- Land use
- industrial
Project history
- 2024-05-15 · #2024-05-industrial-building-addition-224-east-ki · SLD submission (stage not stated)
Map pin is approximate.
The full picture AI research · Nov 17, 2026
A building addition is proposed at an existing industrial and manufacturing facility at 224 East King St in East Berlin Borough, Adams County. The county planning commission looked at a land development submission for it at its May 15, 2024 meeting. The agenda did not give the addition's size, the stage of the plan, or the owner.
The site is an existing industrial property. A LoopNet property record, built from county tax data, lists the parcel as general industrial on about 30.7 acres. No news coverage, borough minutes, developer page, permit or listing about the addition itself was found. It is not known whether the addition has been built.
What it could mean nearby
- Size and use of the addition are not published, so effects on traffic, noise or jobs cannot be judged from the records.
- The addition is on an existing industrial site, so it would not create new homes.
Where it stands
The only record found is the county planning commission's review on May 15, 2024. No approval, permit or construction was found. Normally the borough decides the plan next, and building permits would follow once it is approved.
- May 15, 2024 County planning commission reviewed the land development submission for the addition
Around the web
- Adams County Planning CommissionAdams County, PA · May 15, 2024Lists the May 15, 2024 meeting where the submission was reviewed, with a packet and minutes.
- Property Record, 224 E King StLoopNetShows the parcel as a general industrial property of about 30.7 acres, with no mention of an addition.
Planning terms explained
- Land development (SLD)
- A formal plan for building on or changing a site, which the borough and county review before work starts.
- County planning commission
- An advisory county body that reviews local plans and sends comments to the borough.
Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: East Berlin Borough council and its planning commission handle local land development review, and residents can contact the borough office or attend its public meetings.
In Pennsylvania, East Berlin Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the East Berlin Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the East Berlin Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find East Berlin Borough's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Building addition at 224 East King Stsame area · 68,800 sq ft non-residential, industrial · East Berlin · filed 2024-05-15
- Building addition, industrial facility, E King Stsame area · industrial · East Berlin Borough · filed 2024-07-17
- Lot line reconfiguration on Abbottstown Stsame area · lot line change · East Berlin Borough · filed 2024-02-21
- New shop and office at 3390 Carlisle Pikesame area · 4,360 sq ft non-residential, office · Hamilton Township · filed 2026-01-21
- 1.9-acre subdivision in Paradise Townshipsame area · single-family homes · Paradise Township · filed 2025-07-02
- 24.8-acre subdivision in Paradise Townshipsame area · single-family homes · Paradise Township · filed 2025-07-07