PlannedNearby

Adams County · Straban Township · #2024-05-utility-scale-solar-project-adams-miller · Solar farms tracker

Utility-scale solar project, Adams Miller Solar

Straban Township, PA · government & utilities

In short: Utility-scale solar project, Adams Miller Solar is a government or utility project in Straban Township, Adams County, PA. As of November 24, 2026, the public records we track show nothing newer since May 15, 2024. The town may have acted since.

No recent records Latest record we have · May 15, 2024
  1. Proposed
  2. In reviewMay 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

About this project

A utility-scale solar project in Straban Township. The agenda does not give its size or the current use of the land.

Plan type
SLD submission (stage not stated)
Land use
other

Project history

  • 2024-05-15 · #2024-05-utility-scale-solar-project-adams-miller · SLD submission (stage not stated)

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 17, 2026

Adams Miller Solar is a proposed 3-megawatt solar farm at 30 Miller Road in Straban Township. The developer is SolAmerica Energy. It would sit on a 123-acre site. About 7.43 of those acres are in neighboring Cumberland Township, along Boyds School Road, with an entrance off Old Harrisburg Road.

The county agenda didn't say how big the project is or what the land is used for now. Local news coverage gives the size and location, but no source found says what the land is used for today. Roughly 26 acres, about a fifth of the site, would be disturbed during construction.

Two neighboring landowners opposed the plan at a January 2025 township meeting. They argued that the developer rushed the plan to beat stricter 2024 solar rules. They also raised concerns about stormwater runoff into Rock Creek, glare and inverter noise. The developer disputed the claims about deficiencies in its stormwater study.

What it could mean nearby

Where it stands

The latest news coverage found (January 2025) shows Straban's supervisors tabling the preliminary land development plan for further discussion, and Cumberland Township also tabled its review. No source found shows a later approval or construction. A final land development plan and state agency approvals would normally come next.

Who's behind it

SolAmerica Energy · A solar developer that is also proposing the separate Adams Buohl solar project on Old Harrisburg Road in Straban Township.

Around the web

Planning terms explained
Preliminary land development plan
The first detailed site plan a township reviews before it grants final approval.
Tabled
A board postponed action without approving or denying the item.
Inverter
Equipment that converts the panels' direct-current power into the alternating current that the grid uses.
Stormwater management
The plan for handling rain runoff so a site doesn't cause erosion or flooding downstream.

Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Straban Township Board of Supervisors decides on the plan at its public meetings, and Cumberland Township's supervisors have also reviewed the part of the site in their township.

In Pennsylvania, Straban Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Straban Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →