# Building additions and parking, Cumberland Twp

Cumberland Township, PA · government & utilities

In short: **Building additions and parking, Cumberland Twp** is a government or utility project in Cumberland Township, Adams County, PA. As of November 24, 2026, it is completed according to web research. Latest record: A local news report from April 30, 2026 says the $4.3 million project is complete and that administrative staff have moved into the new offices.

Stage: Completed · A local news report from April 30, 2026 says the $4.3 million project is complete and that administrative staff have moved into the new offices. · web research checked Nov 15, 2026 · [source](https://gettysburgconnection.org/?p=106958) AI research

## About this project

Building additions and a parking lot reconfiguration for the Cumberland Township building expansion. Listed among July 2024 submissions.

**County recommendation:** No position

- **Plan type:** Land development
- **Land use:** municipal

## Project history

- **2024-09-18** · #2024-09-building-additions-and-parking-cumberlan · Land development

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

Cumberland Township expanded and renovated its own municipal building at 1370 Fairfield Road. The work also covered more parking and stormwater facilities. The goal was to bring the municipal offices and the police department together in one updated building.

The township's project cost about $4.3 million. A local news report from April 2026 says the building grew by roughly 38 percent, to about 12,260 square feet. It also says the building now has ADA-compliant spaces, public meeting rooms, and upgraded police areas. The original building dates from 1979.

Construction began in spring 2025. Township staff returned to the building in April 2026, and the board held its first meeting there on April 28, 2026. The police department was to stay at its temporary site until the end of May 2026. Township minutes also list rear parking lot paving as a later item.

### What it could mean nearby

- Public meetings, township offices and polling for the November general election are in the renovated building at 1370 Fairfield Road.
- Police operations were to move back to the building by about June 2026. The new space is meant to meet current police standards.
- Added parking and stormwater facilities were part of the campus work, so on-site parking should be easier for visitors.

### Where it stands

The county planning commission reviewed the land development in September 2024. The township then bid the work, started construction in 2025, and reported the building complete in April 2026. Only the remaining police move-in and rear parking lot paving were still being finished. Note: The county records stop at the 2024 planning review, but township and news sources show construction began in 2025 and the building was occupied in April 2026.

- **Jun 2026** Township agenda lists a bid for rear parking lot paving
- **Apr 28, 2026** Supervisors hold their first meeting in the renovated building
- **Apr 2026** Administrative staff return to the completed building
- **Feb 25, 2025** Supervisors accept and award bids for the renovation
- **Feb 4, 2025** Bids due for the addition and renovations
- **Sep 18, 2024** County planning commission reviews the land development

### Who's behind it

Cumberland Township (municipal owner) · The township government is the owner and is building its own municipal and police facility. The general construction contractor was reported as eciConstruction LLC, though that award was not confirmed in the township minutes read.

### Around the web

- [Cumberland Township administration returns to renovated building](https://gettysburgconnection.org/?p=106958) — Gettysburg Connection · Apr 30, 2026Reports the $4.3 million project complete, with about 12,260 sq ft and staff moved in.
- [Cumberland Township New Municipal Building and Police Station nearing completion](https://gettysburgconnection.org/?p=103422) — Gettysburg Connection · Jan 27, 2026Says construction was on schedule, with completion expected in April.
- [Cumberland Township awarded state grant to advance municipal campus and police department building project](https://gettysburgconnection.org/?p=82040) — Gettysburg Connection · Nov 13, 2024Describes state grant funding for the municipal campus and police building.
- [Planning Commission Minutes September 12, 2024](https://cumberlandtwppa.gov/getattachment/2ba9ab31-6536-4421-a83d-51f3cef3342a/Planning-Commission-Minutes-September-12,-2024.pdf) — Cumberland Township · Sep 12, 2024Township planning commission minutes on the building expansion and parking plan.
- [February 18th Building Workshop](https://cumberland.adamscountypa.gov/getmedia/020bedbc-4ae8-4b7a-9934-3ddbbd3876ea/02-February-18th-Building-Workshop.pdf) — Cumberland Township · Feb 18, 2025Building committee recommended a total investment of about $4.3 million.
- [February 25th Board Meeting](https://cumberland.adamscountypa.gov/getmedia/7a542975-f29d-49ce-984f-520cdba3bb04/02-February-25th-Board-Mtg.pdf) — Cumberland Township · Feb 25, 2025Board made motions to accept and award bids for the renovation.
- [Cumberland Township Municipal Building Addition and Renovations](https://projects.constructconnect.com/details/6903170-cumberland-township-municipal-building-addition-and-renovations-general-hvac-plumbing-and-electrical-contract&find_loc=pennsylvania-17325) — ConstructConnectBid listing with estimated general contract cost of $2.8 million.
- [June 26 Final Agenda](https://www.cumberlandtwppa.gov/getmedia/d1c8f487-47bb-4f05-b869-5c1aaeee5ebb/06-June-26-Final-Agenda.pdf) — Cumberland Township · Jun 26, 2026Lists a bid for rear parking lot paving from the Building Fund.

Planning terms explained

- **Land development:** A formal plan for building or enlarging structures and parking on a site, reviewed by local and county planners.
- **Stormwater facilities:** Basins, pipes and similar features that manage rain runoff from roofs and pavement.
- **RACP grant:** A state Redevelopment Assistance Capital Program grant that helps pay for public building projects.
- **ADA-compliant:** Built to meet accessibility rules for people with disabilities.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** No further approvals appear to be pending, but residents can comment at the Cumberland Township Board of Supervisors' monthly meetings.

In Pennsylvania, Cumberland Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Cumberland Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cumberland Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Cumberland Township's meeting agendas →](https://www.google.com/search?q=Cumberland+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Multifamily dwelling, Misty Ridge Development](https://plannednearby.com/x/adams-sld-24-083) — same area · 40 homes, apartments · Cumberland Township · filed 2024-12-18
- [Lot-line reconfiguration on Ridge Rd](https://plannednearby.com/x/adams-sld-25-024) — same area · lot line change · Cumberland Township · filed 2025-10-15
- [15-lot subdivision of open land, Solomon Rd](https://plannednearby.com/x/adams-sld-24-038) — same area · subdivision (use not stated) · Cumberland Township · filed 2024-07-17
- [Liberty RV stormwater plan on Knight Road](https://plannednearby.com/x/adams-sld-25-093) — same area · retail & commercial · Cumberland Township · filed 2026-01-21
- [Townhouse development with open space, Table Rock Terrace](https://plannednearby.com/x/adams-2024-05-townhouse-development-with-open-space-ta) — same area · townhomes · Cumberland Township · filed 2024-05-15
- [GMA wellhouse on existing easement](https://plannednearby.com/x/adams-2024-07-gma-wellhouse-on-existing-easement) — same area · other · Cumberland Township · filed 2024-07-17

[See everything nearby on a map →](https://plannednearby.com/near#39.79204,-77.23861,Cumberland%20Township)

---

Source page: https://plannednearby.com/x/adams-2024-09-building-additions-and-parking-cumberlan

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.