Adams County · Cumberland Township · #2026-05-154-lot-single-family-subdivision-the-cr · Large housing developments (100+ homes) tracker
154-lot single-family subdivision (The Crossings)
Cumberland Township, PA · 154 homes, single-family homes
In short: 154-lot single-family subdivision (The Crossings) is a single-family home development in Cumberland Township, Adams County, PA. It would add 154 homes. Its estimated construction value is about $86.2M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Cumberland Township Planning Commission: preliminary plan recommendation, tabled (October 8, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
A plan for a single-family home development called The Crossings in Cumberland Township, consisting of 154 lots. The agenda does not give the site location, acreage, or current use.
- Plan type
- SLD plan (type not specified)
- Land use
- single-family
Project history
- 2026-10-08 · Cumberland Township Planning Commission · Preliminary plan recommendation · Tabled · source
- 2026-05-20 · #2026-05-154-lot-single-family-subdivision-the-cr · SLD plan (type not specified) · 154 lots/units
Map pin is approximate.
The full picture AI research · Nov 18, 2026
The Crossings is a proposed single-family neighborhood in Cumberland Township, near Gettysburg. County records list 154 lots. Township planning records place it on about 54 acres along Old Mill Road, across from the Gettysburg Airport. The plan also includes three open-space lots managed by a homeowners' association. It uses a "cluster" design that packs homes closer together to leave more open land.
The plan has been under review for years. A local news report says the first submission was in May 2022. In January 2024 the township supervisors refused another extension, which meant the developer had to resubmit. Planning commission minutes show later reviews that raised concerns about wetlands, stormwater and airport rules. A June 2026 resubmission was tabled, and one summary of those minutes described it as 151 lots, not 154. No homes for sale, construction or builder page for this project turned up.
What it could mean nearby
- Old Mill Road widening and sidewalks are described in township planning records as part of the proposal.
- Public water and public sewer are described as the planned utilities.
- The site is next to the Gettysburg Airport, so airport-hazard rules and a federal aviation review have been part of the discussion.
- Wetlands on the site have required extra stormwater planning, and three open-space lots are proposed.
Where it stands
The formal preliminary plan is still under review. The township planning commission is scheduled to consider a recommendation on 2026-10-08, and no approval was found. Next, the plan would normally go to the township supervisors for a decision, and building permits could follow only after final approval. Note: Search summaries of the June 2026 planning commission minutes describe a resubmitted plan with 151 lots, while the county records list 154; the minutes could not be opened directly to confirm.
- Oct 8, 2026 Township planning commission scheduled to consider a preliminary plan recommendation
- Jun 11, 2026 Planning commission tabled a resubmitted preliminary plan
- Aug 14, 2025 Planning commission reviewed the plan again, with wetlands, stormwater and airport review discussed
- Mar 14, 2024 Planning commission tabled the plan over environmental issues
- Jan 23, 2024 Township supervisors denied a further extension, and the developer had to resubmit
- Apr 13, 2023 Planning commission minutes describe the 154-lot plan on about 53.7 acres
Who's behind it
FLI-Davis Hauser · A local news report named this company as the developer in 2024. Search summaries of 2023 minutes mention an engineer representing S & A Homes, so the current builder is unconfirmed.
Around the web
- October 8 Planning Commission AgendaCumberland Township · Oct 8, 2026Lists the preliminary plan recommendation for The Crossings.
- Planning Commission Minutes June 11, 2026Cumberland Township · Jun 11, 2026A search summary of these minutes describes a resubmitted plan on 53.696 acres along Old Mill Road that was tabled.
- Planning Commission Minutes August 14, 2025Cumberland Township · Aug 14, 2025A search summary says these minutes cover wetlands, stormwater and the airport review.
- Planning Commission Minutes March 14, 2024Cumberland Township · Mar 14, 2024A search summary says the plan was tabled over environmental issues.
- Cumberland Township denies extension for The Crossing homes; celebrates Waybright Farm easementGettysburg Connection · Jan 26, 2024Reports that supervisors denied an extension, that the developer is FLI-Davis Hauser and that the site is between Old Mill Road and the airport.
- Planning Commission Minutes April 13, 2023Cumberland Township · Apr 13, 2023A search summary says these minutes describe 154 single-family lots and three open-space lots on 53.696 acres.
Planning terms explained
- Preliminary plan
- A detailed layout of lots, roads and utilities that the township reviews before the final plan is approved.
- Tabled
- A board postponed action on an item without approving or denying it.
- Cluster overlay
- A zoning option that allows smaller lots in exchange for more shared open space.
- Open space/HOA lots
- Land kept undeveloped and maintained by the homeowners' association.
- Extension
- More time that the township grants a developer to fix a plan before the legal review deadline.
Researched by AI from public sources on Nov 18, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Cumberland Township Planning Commission makes a recommendation and the township supervisors decide, so residents can comment at their public meetings or by writing to the township office.
In Pennsylvania, Cumberland Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Cumberland Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cumberland Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Cumberland Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $86.2M
- ~4,928 roofing squares
- ~154 HVAC systems
- ~154 kitchens / 308+ bathrooms
- ~431,200 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 4-acre agricultural/open space subdivision, Cumberland Twpsame area · agricultural · Cumberland Township · filed 2024-11-20
- Table Rock Terrace corrective plan (street names)same area · other · Cumberland Township · filed 2026-03-18
- Lot-line reconfiguration on Ridge Rdsame area · lot line change · Cumberland Township · filed 2025-10-15
- Township building addition, 1370 Fairfield Rdsame area · 5,740 sq ft non-residential, government & utilities · Cumberland Township · filed 2024-08-21
- Liberty RV stormwater plan on Knight Roadsame area · retail & commercial · Cumberland Township · filed 2026-01-21
- Building additions and parking, Cumberland Twpsame area · government & utilities · Cumberland Township · filed 2024-09-18