[Adams County](https://plannednearby.com/c/adams-pa/) · [Straban Township](https://plannednearby.com/c/adams-pa/straban-township) · #2024-07-adams-miller-buohl-solar-project-straban · [Solar farms tracker](https://plannednearby.com/topics/solar-farms/)

# Adams Miller Buohl solar project, Straban Twp

Straban Township, PA · government & utilities

In short: **Adams Miller Buohl solar project, Straban Twp** is a government or utility project in Straban Township, Adams County, PA. As of November 24, 2026, the public records we track show nothing newer since July 17, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Jul 17, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

A utility-scale solar project proposed in Straban Township by Adams Miller Buohl Solar Properties. The agenda gives no acreage or location details.

- **Applicant:** [Adams Miller Buohl Solar Properties](https://plannednearby.com/f/solamerica-energy)
- **Plan type:** Utility-scale solar
- **Land use:** other

## Project history

- **2024-07-17** · #2024-07-adams-miller-buohl-solar-project-straban · Utility-scale solar

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

A company called SolAmerica Energy proposed two small solar farms in Straban Township. News coverage names them Adams Miller (30 Miller Road) and Adams Buohl (2145 Old Harrisburg Road). The county record appears to combine them under one name. Adams Miller is described as a 3 MW array on about 123 acres, with about 7.43 acres in neighboring Cumberland Township. Engineers estimated that about 26 acres would be disturbed. The article on Adams Buohl gives no size.

In January 2025 the township supervisors approved a preliminary plan for Adams Buohl by a 2-1 vote. They tabled Adams Miller. Neighbors raised concerns about runoff into Rock Creek, glare and noise. They also argued the plan was rushed in before the township changed its solar rules in 2024. An August 2025 opinion piece says the supervisors later approved Adams Miller. It also says the state environmental agency set a deadline for the developer to fix 47 issues. No news or permit record showing construction was found.

### What it could mean nearby

- Stormwater runoff into Rock Creek was the main concern raised by neighbors and Cumberland Township.
- Glare on Boyds School Road and inverter noise were also raised.
- The Adams Miller entrance is planned off Old Harrisburg Road.
- About 26 acres of the Miller site would be disturbed.

### Where it stands

Both projects appear to be in plan review. Adams Buohl has preliminary approval, and Adams Miller was reportedly approved in 2025 by an advocacy source, although no news report of the vote was found. Final township plan approval and state permits, including the stormwater permit, normally come before construction.

- **Aug 6, 2025** Opinion piece says supervisors approved Adams Miller and the state environmental agency flagged 47 plan issues
- **Feb 3, 2025** Straban supervisors planned to take up Adams Miller again (outcome not found in news)
- **Jan 28, 2025** Cumberland Township tabled its action on the Miller project
- **Jan 6, 2025** Straban supervisors approved the Adams Buohl preliminary plan 2-1 and tabled Adams Miller
- **Jul 17, 2024** County planning commission reviewed the utility-scale solar project

### Who's behind it

SolAmerica Energy (listed in county records as Adams Miller Buohl Solar Properties) · A solar developer with other projects in Pennsylvania, including Buffalo Township in Butler County.

### Around the web

- [Straban hears opposition and support on proposed solar projects](https://gettysburgconnection.org/?p=85068) — Gettysburg Connection · Jan 9, 2025Gives the locations and the January 2025 votes (Buohl approved 2-1, Miller tabled), plus the opposition arguments.
- [Cumberland Township tables board action regarding Straban solar energy farm project](https://gettysburgconnection.org/?p=86575) — Gettysburg Connection · Feb 2, 2025Gives the Miller size (123 acres, 3 MW, 7.43 acres in Cumberland Township) and the stormwater concerns.
- [Straban needs change](https://gettysburgconnection.org/straban-needs-change) — Gettysburg Connection (opinion) · Aug 6, 2025An advocacy piece says Adams Miller was approved and that the state environmental agency flagged 47 issues.
- [Planning Commission](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission) — Adams CountyCounty page listing the July 2024 meeting packet and minutes. It does not mention the project.

Planning terms explained

- **Preliminary land development plan:** An early, detailed site plan the township reviews before a final plan can be approved.
- **Final land development plan:** The last township approval of the site plan, normally needed before building.
- **Tabled:** Put off for later discussion without a decision.
- **Stormwater management:** Design to control rain runoff so it doesn't cause flooding or pollute streams.
- **Grandfathered:** Reviewed under the older rules because the application was filed before the rules changed.

Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Straban Township supervisors decide on the final land development plan at public meetings, and Cumberland Township supervisors have also taken up the Miller project.

In Pennsylvania, Straban Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Straban Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Straban Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Straban Township's meeting agendas →](https://www.google.com/search?q=Straban+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Union Square apartment complex](https://plannednearby.com/x/adams-2024-07-union-square-apartment-complex) — same area · apartments · Straban Township · filed 2024-07-17
- [Standalone retail with two drive-thru lanes](https://plannednearby.com/x/adams-2024-07-standalone-retail-with-two-drive-thru-la) — same area · retail & commercial · Straban Township · filed 2024-07-17
- [Popeyes and shopping center, Straban Township](https://plannednearby.com/x/adams-sld-22-010) — same area · 10,098 sq ft non-residential, mixed use · Straban Township · filed 2024-11-20
- [Gettysburg Plant Building Expansion](https://plannednearby.com/x/adams-sld-24-008) — same area · 64,995 sq ft non-residential, industrial · Straban Township · filed 2024-02-21
- [Granite Lake Phase 1 residential, Straban Township](https://plannednearby.com/x/adams-sld-21-006) — same area · 61 homes, single-family homes · Straban Township · filed 2024-11-20
- [Dairy farmstead on Swift Run Rd](https://plannednearby.com/x/adams-sld-24-080) — same area · 9,680 sq ft non-residential, agricultural · Straban Township · filed 2024-12-18

[See everything nearby on a map →](https://plannednearby.com/near#39.87692,-77.14603,Straban%20Township)

---

Source page: https://plannednearby.com/x/adams-adams-miller-buohl-solar-project-straban-5eeea0

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
