In short: **Adams Miller solar project, Straban Twp** is a government or utility project in Straban Township, Adams County, PA. As of November 24, 2026, the public records we track show nothing newer since July 17, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Jul 17, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

A utility-scale solar project proposed in Straban Township by Adams Miller Solar Development. The agenda gives no acreage or location details.

- **Applicant:** [Adams Miller Solar Development](https://plannednearby.com/f/solamerica-energy)
- **Plan type:** Utility-scale solar
- **Land use:** other

## Project history

- **2024-07-17** · #2024-07-adams-miller-solar-project-straban-twp · Utility-scale solar

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 16, 2026

Adams Miller is a proposed utility-scale solar farm in Straban Township, Adams County, from Adams Miller Solar Development. News coverage links it to the developer SolAmerica Energy. It would be a roughly 3 megawatt array on about 123 acres at 30 Miller Road. About 7.43 of those acres lie across the line in Cumberland Township. Engineers estimated about 26 acres would be disturbed. The land is farmland now.

The county planning commission reviewed the project in July 2024. In January 2025, Straban's supervisors tabled the plan after neighbors objected. They questioned the stormwater study and the land survey. The developer disputed those criticisms. Cumberland Township's supervisors also tabled their review in January 2025, and a nearby school asked for more time. Cumberland's planning commission listed an "Adams-Miller Solar Final Plan" on its April 2026 agenda, but that document could not be read.

No reports of construction, permits or a final approval were found.

### What it could mean nearby

- Stormwater and erosion in nearby Rock Creek were raised by opponents and reviewed by Cumberland Township's engineer.
- Noise from solar inverters was a neighbor concern. The developer said they would sit in the middle of the site, away from adjoining properties.
- Access would come from an entrance off Old Harrisburg Road, with the site near Boyds School Road. A nearby school asked for a longer review.
- About 26 acres of the 123-acre site would be disturbed, so most of the land would stay undisturbed.

### Where it stands

The latest coverage found (early 2025) shows the Straban supervisors tabling the plan. Cumberland's 2026 planning agenda suggests a final plan was still under review, though the outcome was not confirmed. If the plan is approved, state stormwater and other permits and then construction would normally follow.

- **Apr 9, 2026** Cumberland Township planning commission meeting listing an Adams-Miller Solar final plan (contents not readable)
- **Feb 3, 2025** Straban supervisors scheduled to take the project up again; outcome not found
- **Jan 28, 2025** Cumberland Township supervisors tabled the item for engineer review
- **Jan 6, 2025** Straban supervisors voted unanimously to table the project
- **Jul 17, 2024** Adams County Planning Commission reviewed the utility-scale solar project

### Who's behind it

Adams Miller Solar Development (SolAmerica Energy, per news reports) · News coverage describes SolAmerica Energy as a solar developer that proposed two Straban projects, Adams Miller and Adams Buohl.

### Around the web

- [Straban hears opposition and support on proposed solar projects](https://gettysburgconnection.org/?p=85068) — Gettysburg Connection · Jan 9, 2025Straban supervisors tabled Adams Miller at 30 Miller Road; neighbors raised stormwater and survey concerns and the developer disputed them.
- [Cumberland Township tables board action regarding Straban solar energy farm project](https://gettysburgconnection.org/?p=86575) — Gettysburg Connection · Feb 2, 2025Gives the project's size (123 acres, 7.43 in Cumberland Township), the 3 MW capacity and the Cumberland tabling.
- [Planning Commission Minutes April 9, 2026](https://cumberland.adamscountypa.gov/getattachment/a537ad3a-0d59-42ce-bc89-d64721deaf52/Planning-Commission-Minutes-April-9,-2026.pdf) — Cumberland Township · Apr 9, 2026Search results show an Adams-Miller Solar final plan on the agenda, but the document could not be read.
- [Adams County Planning Commission](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission) — Adams County · Jul 17, 2024County page listing the July 17, 2024 commission meeting where the project was reviewed.

Planning terms explained

- **Land development plan:** A detailed site plan a township reviews and approves before building starts.
- **Tabled:** A board postponed a decision to a later meeting without approving or denying.
- **Stormwater management:** Plans for controlling rain runoff so it doesn't cause flooding or erosion.
- **Utility-scale solar:** A solar farm that sells electricity to the grid rather than powering one building.

Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Straban Township supervisors decide on the land development plan, and residents can comment at their public meetings. Cumberland Township's supervisors review the part of the site that lies in their township.

In Pennsylvania, Straban Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Straban Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Straban Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Straban Township's meeting agendas →](https://www.google.com/search?q=Straban+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Gettysburg Plant Building Expansion](https://plannednearby.com/x/adams-sld-24-008) — same area · 64,995 sq ft non-residential, industrial · Straban Township · filed 2024-02-21
- [Amblebrook Section E residential, Straban Township](https://plannednearby.com/x/adams-sld-05-190) — same area · 528 homes, single-family homes · Straban Township · filed 2024-11-20
- [9,000 sq ft pole building on New Chester Rd](https://plannednearby.com/x/adams-sld-25-092) — same area · 9,000 sq ft non-residential, retail & commercial · Straban Township · filed 2026-01-21
- [189 single-family and 76 townhome units, Straban](https://plannednearby.com/x/adams-2024-07-189-single-family-and-76-townhome-units) — same area · 265 homes, single-family homes · Straban Township · filed 2024-07-17
- [Utility-scale solar farm on Miller Rd](https://plannednearby.com/x/adams-sld-24-016) — same area · government & utilities · Straban Township · filed 2024-12-18
- [Dairy farmstead on Swift Run Rd](https://plannednearby.com/x/adams-sld-24-080) — same area · 9,680 sq ft non-residential, agricultural · Straban Township · filed 2024-12-18

[See everything nearby on a map →](https://plannednearby.com/near#39.87786,-77.15842,Straban%20Township)

---

Source page: https://plannednearby.com/x/adams-adams-miller-solar-project-straban-twp-391819

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.