[Adams County](https://plannednearby.com/c/adams-pa/) · [Cumberland Township](https://plannednearby.com/c/adams-pa/cumberland-township) · #2024-02-agricultural-lot-subdivision-for-new-res

# Agricultural lot subdivision for new residential lot

Cumberland Township, PA · lot line change

In short: **Agricultural lot subdivision for new residential lot** is a lot line change in Cumberland Township, Adams County, PA. As of November 24, 2026, the public records we track show nothing newer since February 21, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Feb 21, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Subdivides an agricultural lot in Cumberland Township to create one new residential lot. The agenda does not give lot size or the current use of the remaining land.

- **Plan type:** Subdivision (type not stated)
- **Land use:** lot-line-change

## Project history

- **2024-02-21** · #2024-02-agricultural-lot-subdivision-for-new-res · Subdivision (type not stated)

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 17, 2026

A private landowner in Cumberland Township, Adams County, proposed splitting one piece of farmland to create a single new lot for a house. The county planning commission reviewed the plan on 2024-02-21.

Township planning minutes appear to describe the same plan. They show an existing lot along Blackhorse Tavern Road split into two. One lot of about 3.1 acres keeps the existing home. A new residential building lot of about 7.09 acres would sit under a land conservancy easement, with a stream and floodplain area. The match to the county item rests on the same applicant and the same kind of plan. It is not confirmed by an address.

The township planning commission first tabled the plan in February 2024 so a lot line could be moved away from the conservation easement. A township supervisors agenda for 2024-03-26 lists final plan approval. No source was found that shows a house being built. No news coverage, listings or developer pages were found.

### What it could mean nearby

- One additional home lot is a small change, so little added traffic is expected on Blackhorse Tavern Road.
- The new lot would be served by on-site septic. The township agenda mentions a sewage planning exemption.
- A conservation easement and a stream and floodplain area cover part of the property. This limits where building can happen.

### Where it stands

The township supervisors' 2024-03-26 agenda lists final plan approval for this subdivision. The vote itself could not be read, so approval is not confirmed. If it was approved, the next steps would be recording the plan and the owner applying for a building permit for a house.

- **Mar 26, 2024** Township supervisors' agenda lists final subdivision plan approval and sewage planning exemption (vote not confirmed)
- **Mar 14, 2024** Township planning commission reviews the revised plan: a 3.1-acre lot keeps the existing home and a 7.09-acre lot would be new
- **Feb 21, 2024** County planning commission reviews the subdivision of an agricultural lot to create a new residential lot
- **Feb 8, 2024** Township planning commission tables the plan so a lot line can be moved away from a conservation easement

### Around the web

- [ACPC Minutes February 2024](https://www.adamscountypa.gov/getmedia/6213ed68-1cc2-46c9-941c-0746bf72aebe/ACPC_Min_Feb24.pdf) — Adams County Planning Commission · Feb 21, 2024Lists the county review of a Cumberland Township subdivision of an agricultural lot to create a new residential lot.
- [Planning Commission Minutes February 8, 2024](https://cumberland.adamscountypa.gov/getattachment/34d920e9-e862-4be0-b281-1f3365cbcf7e/Planning-Commission-Minutes-February-8,-2024.pdf) — Cumberland Township · Feb 8, 2024The township planning commission tabled the plan so a lot line could be moved away from a conservation easement.
- [Planning Commission Minutes March 14, 2024](https://cumberland.adamscountypa.gov/getattachment/b56258cc-d818-41ad-942e-b4a7a76caa47/Planning-Commission-Minutes-March-14,-2024.pdf) — Cumberland Township · Mar 14, 2024Describes the split into a 3.1-acre lot with the existing home and a 7.09-acre new residential lot on Blackhorse Tavern Road.
- [Board of Supervisors March 26, 2024](https://cumberland.adamscountypa.gov/getmedia/2a67b9db-7860-490b-b8e3-dd5dcba278cf/03-March-26.pdf) — Cumberland Township · Mar 26, 2024Supervisors' meeting record that lists final plan approval and a sewage exemption for the subdivision.

Planning terms explained

- **Subdivision:** Dividing one parcel of land into two or more separate lots.
- **Conservation easement:** A legal restriction, held by a land conservancy, that limits development on part of a property.
- **Sewage planning exemption:** A state-approved exemption from full sewage planning, used for a small subdivision that will use on-site septic.
- **Lot line change:** An adjustment to the boundary between lots, or a split that creates a new lot.

Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** Township supervisors made the local decision at public meetings. Residents can comment at Cumberland Township meetings, and agendas are posted on the township website.

In Pennsylvania, Cumberland Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Cumberland Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cumberland Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Cumberland Township's meeting agendas →](https://www.google.com/search?q=Cumberland+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Lot addition on Chambersburg Rd](https://plannednearby.com/x/adams-sld-24-004) — same area · lot line change · Cumberland Township · filed 2024-02-21
- [Facility renovation with parking and addition](https://plannednearby.com/x/adams-2025-10-facility-renovation-with-parking-and-add) — same area · other · Cumberland Township · filed 2025-10-15
- [Building additions and parking, Cumberland Twp](https://plannednearby.com/x/adams-2024-08-building-additions-and-parking-cumberlan) — same area · government & utilities · Cumberland Township · filed 2024-08-21
- [Townhouse development, Table Rock Terrace](https://plannednearby.com/x/adams-2024-07-townhouse-development-table-rock-terrace) — same area · townhomes · Cumberland Township · filed 2024-07-17
- [2-lot residential subdivision, Old Mill Rd](https://plannednearby.com/x/adams-sld-24-039) — same area · lot line change · Cumberland Township · filed 2024-07-17
- [Liberty RV stormwater plan on Knight Road](https://plannednearby.com/x/adams-sld-25-093) — same area · retail & commercial · Cumberland Township · filed 2026-01-21

[See everything nearby on a map →](https://plannednearby.com/near#39.79102,-77.24775,Cumberland%20Township)

---

Source page: https://plannednearby.com/x/adams-agricultural-lot-subdivision-for-new-res-a87ee3

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
