[Adams County](https://plannednearby.com/c/adams-pa/) · [Hamiltonban Township](https://plannednearby.com/c/adams-pa/hamiltonban-township) · #SLD-15-004

# Monastery institutional plan on Water St

465 Water St, Hamiltonban Township, PA · institutional · 125.6 acres

In short: **Monastery institutional plan on Water St** is an institutional project at 465 Water St in Hamiltonban Township, Adams County, PA. The site is 125.6 acres. As of November 24, 2026, it is under construction according to web research. Latest record: A September 2026 news report says the monastery is about 20% built and that the oratory was dedicated in 2024. What usually happens next: completion and occupancy.

Stage: Under construction · A September 2026 news report says the monastery is about 20% built and that the oratory was dedicated in 2024. · web research checked Nov 15, 2026 · [source](https://www.catholicworldreport.com/2026/09/01/carmelite-sisters-building-a-monastery-to-last-a-thousand-years-in-pennsylvania/) AI research

Usually next: completion and occupancy.

## About this project

Resubmitted institutional plan for the Monastery of Jesus, Mary and Joseph at 465 Water St in Hamiltonban Township. The site is about 125.6 acres, and the table lists no new homes or building square footage.

**County recommendation:** No position

- **Plan type:** Institutional land development (resubmission)
- **Land use:** institutional
- **Zoning:** A/R/I

## Project history

- **2024-09-18** · #SLD-15-004 · Institutional land development (resubmission)

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 15, 2026

The plan covers the Monastery of Jesus, Mary and Joseph, a community of cloistered Carmelite nuns. It sits on about 125.6 acres on Water Street near Fairfield. The county table lists no new homes and no new building square footage. The monastery is being built in stages over many years.

The nuns' own site and press coverage show the project is already partly built. An oratory (a small chapel) was dedicated in 2024. The nuns' site also describes a woodshed, a utility garage and guest cottages built with stone from the property. A September 2026 report says the project is about 20% complete. It puts the budget at $100 million, with about $22 million raised, and expects 12 to 15 more years of work. The builders are using traditional stone and timber methods.

The nuns' site lists a novitiate (a building for new members) with groundbreaking planned for autumn 2025. No source confirms that work started.

### What it could mean nearby

- Construction is slow and phased over a decade or more, so building activity on the site is likely to continue at a modest pace.
- Township staff have raised questions about capacity at the Fairfield municipal sewer plant and about whether earlier stormwater and sewer approvals still cover added buildings.
- The county table lists no new homes, so the plan is unlikely to add households or school children.

### Where it stands

The county planning commission reviewed a resubmitted plan on 2024-09-18, and the township planning commission discussed a revised plan in February 2025. No source found shows a final decision on the revised plan. Work has been under way for years under an earlier recorded plan, and the revised plan is still a formal plan under review. Note: The nuns' own site and news coverage give the address as 327 Water St, while the county record lists 465 Water St. A 2018 local item used 465, so this is probably a change of address label.

- **Sep 2026** News report says the monastery is about 20% complete, with 12 to 15 years of work left
- **Feb 25, 2025** Township planning commission meeting listed a revised land development plan for the monastery
- **Sep 18, 2024** County planning commission reviewed the resubmitted institutional plan
- **Aug 27, 2024** Township planning commission recommended a 90-day extension for the plan
- **2024** Oratory dedicated
- **Jan 29, 2015** Original land development plan approved and recorded

### Who's behind it

[Discalced Carmelites of Jesus, Mary and Joseph (Fairfield Carmelites)](https://www.fairfieldcarmelites.org/) · A community of cloistered Carmelite nuns building their own monastery on the Fairfield site, using traditional stone and timber methods.

### Around the web

- [Carmelite sisters building a monastery to 'last a thousand years' in Pennsylvania](https://www.catholicworldreport.com/2026/09/01/carmelite-sisters-building-a-monastery-to-last-a-thousand-years-in-pennsylvania/) — Catholic World Report · Sep 1, 2026The project is about 20% complete, the oratory was dedicated in 2024, and 12 to 15 years of work remain.
- [A Monastery Built to Last](https://www.fairfieldcarmelites.org/a-new-monastery) — Fairfield CarmelitesThe nuns' project page describes the stone buildings and lists a novitiate groundbreaking for autumn 2025.
- [Fairfield Carmelites monastery item](https://emmitsburg.net/archive_list/articles/ce/fairfield/2018/monastery.htm) — Emmitsburg.net · 2018A 2018 item gave the new monastery's address as 465 Water Street.
- [Fairfield monastery article](https://1.emmitsburg.net/archive_list/articles/ce/fairfield/2022/monastery.htm) — Emmitsburg.net · 2022Describes a ten-building plan across two townships and county comments that the layout differed from the recorded plan.
- [2-25-2025 PC meeting minutes](https://hamiltonban.adamscountypa.gov/getmedia/fd613bcb-ee57-403e-90a5-20ff50399e9d/2-25-2025-PC-meeting-minutes.pdf) — Hamiltonban Township · Feb 25, 2025Township planning commission minutes from the February 2025 meeting, which a search summary tied to the revised monastery plan; the file could not be read directly.
- [Adams County Planning Commission](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission) — Adams County · Sep 18, 2024County record of the 2024-09-18 review of the resubmitted plan.

Planning terms explained

- **Land development plan:** A detailed site plan showing the buildings, roads, water, sewer and stormwater for a project, which the township must approve.
- **Institutional:** A use such as a religious community, school or hospital rather than homes or shops.
- **Resubmission:** A revised version of a plan sent back for review after earlier comments.
- **Oratory:** A small chapel used for prayer.
- **Novitiate:** A building where new members of a religious order live and train.

Researched by AI from public sources on Nov 15, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Hamiltonban Township planning commission and supervisors review the plan at public meetings, and residents can comment there or through the township office; Liberty Township's planning commission has also had the plan on its agenda.

In Pennsylvania, Hamiltonban Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Hamiltonban Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Hamiltonban Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Hamiltonban Township's meeting agendas →](https://www.google.com/search?q=Hamiltonban+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Proposal for existing campground, Hamiltonban Twp](https://plannednearby.com/x/adams-proposal-for-existing-campground-hamilto-4e79b2) — same area · recreation · Hamiltonban Township · filed 2024-07-17
- [Residential/ag lot split into three lots](https://plannednearby.com/x/adams-sld-25-088) — same area · 2 homes, single-family homes · Hamiltonban Township · filed 2026-01-21
- [Monastery buildings and stormwater management](https://plannednearby.com/x/adams-2024-02-monastery-buildings-and-stormwater-manag) — same area · institutional · Hamiltonban Township · filed 2024-02-21
- [Lot additions/subdivisions, Hamiltonban Twp](https://plannednearby.com/x/adams-lot-additions-subdivisions-hamiltonban-t-f0fb64) — same area · lot line change · Hamiltonban Township · filed 2024-08-21
- [Campground-related proposal, Blue Ridge Sportsmen's](https://plannednearby.com/x/adams-2024-05-campground-related-proposal-blue-ridge-s) — same area · recreation · Hamiltonban Township · filed 2024-05-15
- [148-unit residential development at golf course](https://plannednearby.com/x/adams-2026-03-148-unit-residential-development-at-golf) — same area · 148 homes, townhomes · Hamiltonban Township · filed 2026-03-18

[See everything nearby on a map →](https://plannednearby.com/near#39.82179,-77.42151,Hamiltonban%20Township)

---

Source page: https://plannednearby.com/x/adams-sld-15-004

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.