Adams County · Cumberland Township · #SLD-24-004
Lot addition on Chambersburg Rd
1111 Chambersburg Rd, Cumberland Township, PA · lot line change · 8.7 acres
In short: Lot addition on Chambersburg Rd is a lot line change at 1111 Chambersburg Rd in Cumberland Township, Adams County, PA. The site is 8.7 acres. As of November 24, 2026, the public records we track show nothing newer since February 21, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Adds land to an adjacent residential lot and dissolves a proposed alley and some existing tract boundaries. About 1.3 acres is converted on an 8.75-acre site. No new homes are proposed.
- Plan type
- Lot addition (residential)
- Land use
- lot-line-change
- Zoning
- MX
Project history
- 2024-02-21 · #SLD-24-004 · Lot addition (residential)
Map pin is approximate.
The full picture AI research · Nov 17, 2026
This is a lot line change, not a new building project. About 1.3 acres would move from one residential lot to the neighboring residential lot. The plan would also remove a "paper alley", which is an alley that appears on old plans but was never built. Some old tract boundaries would be dissolved too. The combined site is about 8.75 acres in Cumberland Township, and no new homes are proposed.
Township planning commission minutes from February 2024 appear to describe this plan. The summary of those minutes mentions a 1.29-acre lot addition between two lots that already have homes near Chambersburg Road, plus a paper alley. The PDF could not be read in full, so the match is based on a search summary of it. The minutes were not checked for the 1111 Chambersburg Rd address. The township commission reportedly tabled the plan, meaning it postponed a decision. It asked for the alley to be legally extinguished and for soil testing to be finished.
No developer page, listing, construction news or business at this address was found.
What it could mean nearby
- No new homes are proposed, so no added traffic or school demand is expected from this plan.
- Removing the unbuilt paper alley means a mapped but never-built access route would no longer exist on paper.
- The change mainly enlarges one existing residential lot, so visible change on the ground is likely to be small.
Where it stands
County records show the plan was reviewed at the county planning commission meeting on 2024-02-21. A township meeting summary from February 2024 indicates it was tabled pending open items. No later approval or recording was found, so the final outcome is not confirmed. Typically the township supervisors approve the plan once the open items are resolved, and it is then recorded.
- Feb 21, 2024 Lot addition reviewed at a county planning commission meeting
- Feb 8, 2024 Township planning commission reportedly tabled a matching lot addition plan (1.29 acres, paper alley)
Around the web
- Planning Commission Minutes February 8, 2024Cumberland Township, Adams County · Feb 8, 2024A search summary of these minutes describes a 1.29-acre lot addition, a paper alley and a tabled plan. The PDF text could not be read directly.
- Adams County Planning CommissionAdams County · Feb 21, 2024County planning commission page where the lot addition review is recorded.
Planning terms explained
- Lot line change
- A plan that moves a boundary between existing lots without creating new building lots.
- Lot addition
- A transfer of land from one lot to a neighboring lot, which is merged into it.
- Paper alley
- An alley shown on old recorded plans that was never built, which owners can formally remove.
- Tabled
- A board postponed a decision, usually until open questions are answered.
- Deed of consolidation
- A legal deed that merges parcels into a single lot.
Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Cumberland Township Planning Commission and Board of Supervisors handle subdivision and lot addition plans, and residents can comment at their public meetings or by contacting the township office.
In Pennsylvania, Cumberland Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Cumberland Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cumberland Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Cumberland Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Agricultural lot subdivision for new residential lotsame area · lot line change · Cumberland Township · filed 2024-02-21
- Building additions and parking, Cumberland Twpsame area · government & utilities · Cumberland Township · filed 2024-08-21
- Facility renovation with parking and additionsame area · other · Cumberland Township · filed 2025-10-15
- Townhouse development, Table Rock Terracesame area · townhomes · Cumberland Township · filed 2024-07-17
- 2-lot residential subdivision, Old Mill Rdsame area · lot line change · Cumberland Township · filed 2024-07-17
- Subdivision of 70-acre lot into 4 mixed-use lotssame area · mixed use · Cumberland Township · filed 2026-01-21