Adams County · Cumberland Township · #SLD-24-009 · Large housing developments (100+ homes) tracker
154-lot single-family subdivision on Old Mill Rd
Old Mill Rd, Cumberland Township, PA · 154 homes, single-family homes · 53.7 acres
In short: 154-lot single-family subdivision on Old Mill Rd is a single-family home development in Cumberland Township, Adams County, PA. It would add 154 homes on 53.7 acres. Its estimated construction value is about $86.2M, a rough estimate from its size. As of November 24, 2026, the public records we track show nothing newer since March 20, 2024. The town may have acted since.
The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.
About this project
Plans 154 single-family home lots plus 3 open space lots, mostly for stormwater management, on about 53.7 acres. The site is currently undeveloped land.
- Plan type
- Residential subdivision
- Land use
- single-family
- Zoning
- R
Project history
- 2024-03-20 · #SLD-24-009 · Residential subdivision · 154 lots/units
Map pin is approximate.
The full picture AI research · Nov 7, 2026
The Crossings is a proposed neighborhood of single-family homes on about 53.7 acres along Old Mill Road in Cumberland Township, across the road from the Gettysburg airport. County records list 154 home lots plus 3 open-space lots. The open-space lots are mostly for stormwater control. The land is undeveloped.
The plan has been slow. It was first submitted in May 2022. In January 2024 the township supervisors denied the developer's request for another 90-day extension to submit a revised plan. News coverage says the developer had to restart the application, citing unresolved plan deficiencies.
Search summaries of township planning commission minutes suggest the plan was back under review in August 2025 and June 2026. The June 2026 minutes appear to list 151 home lots. The PDF text could not be opened, so this was not confirmed. No sign of construction, lots for sale or builder pages was found.
What it could mean nearby
- The site faces the Gettysburg airport across Old Mill Road. Aviation review, including by the FAA, has been part of the plan's discussion.
- Up to 154 new single-family homes (possibly 151 in a revised plan) would add traffic to Old Mill Road and nearby roads.
- Three open-space lots are meant mainly for managing stormwater runoff.
Where it stands
The plan was denied an extension in January 2024 and later appears to have been resubmitted. Planning commission minutes from 2025 and 2026 suggest it is still under review, and no approval was found. If it is approved, the developer would next need final plan approval, stormwater and other permits, and then site work. Note: Township planning commission minutes from June 2026 appear to list 151 single-family lots rather than the county's 154, though the PDF could not be read to confirm.
- Jun 2026 Planning commission minutes appear to describe a revised plan with 151 lots and 3 open-space lots
- Aug 2025 Planning commission reviewed the preliminary plan for 154 lots, including FAA-related comments
- Mar 20, 2024 Latest county filing
- Jan 23, 2024 Supervisors denied a further 90-day extension; the developer had to restart the application
- Apr 2023 Planning commission agenda listed the preliminary plan for 154 homes on 53.6 acres
- May 2022 Original plan submitted
Who's behind it
FLI-Davis Hauser · Named in local news as the developer of The Crossings. Other township records name a different company, S & A Homes, as the applicant's representative, so which company holds the project is unclear.
Around the web
- Planning Commission Minutes June 11, 2026Cumberland Township · Jun 11, 2026Search summary indicates the plan was described as 151 lots plus 3 open-space lots.
- Planning Commission Minutes August 14, 2025Cumberland Township · Aug 14, 2025Search summary indicates the 154-lot plan on 53.696 acres was under review and the airport lies across Old Mill Road.
- Cumberland Township denies extension for The Crossing homes; celebrates Waybright Farm easementGettysburg Connection · Jan 26, 2024Supervisors denied a 90-day extension in January 2024 because of unaddressed plan deficiencies.
- April Regular MeetingCumberland Township · Apr 13, 2023Search summary indicates the agenda listed The Crossings preliminary plan for 154 homes on 53.6 acres.
Planning terms explained
- Preliminary plan
- An early formal subdivision plan that the township reviews before final approval.
- Cluster overlay
- A zoning option that groups homes on smaller lots to leave more land as open space.
- Open space lots
- Lots set aside from building, here mostly for stormwater basins.
- Extension
- More time the township grants a developer to fix or resubmit a plan.
- Stormwater management
- Systems that hold or slow rain runoff so it does not flood neighbors.
Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Cumberland Township Planning Commission reviews the plan and the Board of Supervisors decides. Residents can comment at their public meetings.
In Pennsylvania, Cumberland Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Cumberland Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cumberland Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Cumberland Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Estimated construction value: $86.2M
- ~4,928 roofing squares
- ~154 HVAC systems
- ~154 kitchens / 308+ bathrooms
- ~431,200 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 53-unit townhouse development on Table Rock Rdsame area · 53 homes, townhomes · Cumberland · filed 2024-05-15
- Parking reconfiguration and building addition, Cumberlandsame area · other · Cumberland Township · filed 2026-01-21
- Township building addition, 1370 Fairfield Rdsame area · 5,740 sq ft non-residential, government & utilities · Cumberland Township · filed 2024-08-21
- 15-lot subdivision, Cumberland Twpsame area · subdivision (use not stated) · Cumberland Township · filed 2024-08-21
- 1-lot residential subdivision on Black Horse Tavern Rdsame area · 1 home, single-family homes · Cumberland Township · filed 2024-03-20
- Lot addition of about 6 acres to GNMPsame area · lot line change · Cumberland · filed 2024-05-15