# Utility-scale solar farm on Old Harrisburg Rd

2145 Old Harrisburg Rd, Straban Township, PA · government & utilities · 156.5 acres

In short: **Utility-scale solar farm on Old Harrisburg Rd** is a government or utility project at 2145 Old Harrisburg Rd in Straban Township, Adams County, PA. The site is 156.5 acres. As of November 24, 2026, it is in review. Latest record: Infrastructure (resubmission) reviewed at a meeting of the county planning commission (December 18, 2024). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Infrastructure (resubmission) reviewed at a meeting of the county planning commission · Dec 18, 2024 · [source](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Utility-scale solar project on about 156 acres at 2145 Old Harrisburg Rd, with about 22 acres converted. The site is zoned MU-2.

- **Plan type:** Infrastructure (resubmission)
- **Land use:** other
- **Zoning:** MU-2

## Project history

- **2024-12-18** · #SLD-24-017 · Infrastructure (resubmission)

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 14, 2026

SolAmerica Energy has proposed a utility-scale solar farm at 2145 Old Harrisburg Rd in Straban Township. County records list a 156-acre site zoned MU-2, with about 22 acres actually converted to solar use. The project is called Adams Buohl Solar Development.

The Straban supervisors voted on January 6, 2025 to approve the preliminary land development plan, according to local news. The developer still needs final township approval and approval from several state agencies. The same developer has a second Straban project, Adams Miller at 30 Miller Rd. Most of the opposition reported at that meeting concerned the Miller project, such as runoff, glare and noise.

No evidence of construction or operation was found. The site is separate from the large, already operating Adams solar array that supplies Philadelphia city buildings.

### What it could mean nearby

- Construction traffic would use Old Harrisburg Rd and nearby roads; the sources give no specific traffic plan for this site.
- Neighbors at the sister Miller project raised stormwater runoff, glare and noise concerns, and similar questions could apply here.
- A solar farm adds no homes or school students and usually needs little in the way of public services.

### Where it stands

The county planning commission reviewed a resubmitted infrastructure plan on 2024-12-18, and the township supervisors then approved the preliminary land development plan on 2025-01-06. Final land development approval and state permits would normally come next, and no source found shows that they have been issued.

- **Jan 6, 2025** Straban supervisors heard public comment and approved the preliminary land development plan for Adams Buohl Solar
- **Dec 18, 2024** County planning commission reviewed the infrastructure resubmission

### Who's behind it

SolAmerica Energy · A solar developer that proposed both the Adams Buohl and Adams Miller solar projects in Straban Township.

### Around the web

- [Straban hears opposition and support on proposed solar projects](https://gettysburgconnection.org/?p=85068) — Gettysburg Connection · Jan 9, 2025Reports the January 6, 2025 supervisors meeting, names SolAmerica Energy as the developer, and says the Buohl preliminary plan was approved with final approval pending.
- [Cumberland Township tables board action regarding Straban solar energy farm project](https://gettysburgconnection.org/?p=86575) — Gettysburg Connection · Jan 2025Covers the sister Adams Miller project, which would have its entrance off Old Harrisburg Rd, and the concerns raised about it.

Planning terms explained

- **Land development plan:** A detailed site plan the township reviews before a large project can be built.
- **Preliminary approval:** An early approval that allows the design to move on to a final plan, but does not yet allow construction.
- **MU-2:** The township zoning category the county lists for this site.
- **Utility-scale solar:** A solar farm that sends power into the electric grid instead of serving one building.

Researched by AI from public sources on Nov 14, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Straban Township Board of Supervisors decides on the final land development plan, and residents can comment at its public meetings.

In Pennsylvania, Straban Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Straban Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Straban Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Straban Township's meeting agendas →](https://www.google.com/search?q=Straban+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Standalone retail with two drive-thru lanes](https://plannednearby.com/x/adams-2024-07-standalone-retail-with-two-drive-thru-la) — same area · retail & commercial · Straban Township · filed 2024-07-17
- [Dairy farmstead on Swift Run Rd](https://plannednearby.com/x/adams-sld-24-080) — same area · 9,680 sq ft non-residential, agricultural · Straban Township · filed 2024-12-18
- [Adams Miller Buohl solar project, Straban Twp](https://plannednearby.com/x/adams-adams-miller-buohl-solar-project-straban-5eeea0) — same area · government & utilities · Straban Township · filed 2024-07-17
- [300-unit apartment complex, Hunterstown Rd](https://plannednearby.com/x/adams-sld-22-023) — same area · 300 homes, apartments · Straban Township · filed 2024-07-17
- [Gettysburg Plant Building Expansion](https://plannednearby.com/x/adams-sld-24-008) — same area · 64,995 sq ft non-residential, industrial · Straban Township · filed 2024-02-21
- [Union Square apartment complex](https://plannednearby.com/x/adams-2024-07-union-square-apartment-complex) — same area · apartments · Straban Township · filed 2024-07-17

[See everything nearby on a map →](https://plannednearby.com/near#39.88309,-77.14451,Straban%20Township)

---

Source page: https://plannednearby.com/x/adams-sld-24-017

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.