[Adams County](https://plannednearby.com/c/adams-pa/) · [Huntington](https://plannednearby.com/c/adams-pa/huntington) · #SLD-24-018

# 1.75-acre lot addition at 8292 Carlisle Pike

8292 Carlisle Pike, Huntington, PA · lot line change · 29.2 acres

In short: **1.75-acre lot addition at 8292 Carlisle Pike** is a lot line change in Huntington, Adams County, PA. The site is 29.2 acres. As of November 24, 2026, the public records we track show nothing newer since May 15, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · May 15, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Adds 1.75 acres to an adjoining lot at 8292 Carlisle Pike. The parent site is about 29 acres zoned AC/CI.

- **Plan type:** Lot addition
- **Land use:** lot-line-change
- **Zoning:** AC/CI

## Project history

- **2024-05-15** · #SLD-24-018 · Lot addition

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 17, 2026

This is a lot line change, not a building project. It moves about 1.75 acres, which includes a tennis court, from one parcel to the neighboring lot at 8292 Carlisle Pike in Huntington Township. The combined land is about 29 acres, and the county lists it as zoned AC/CI.

Township planning commission notes from spring 2024 appear to describe the same plan. They show a roughly 27.5-acre lot (the old campground, farmhouse and tennis court) and a 1.75-acre piece going back to the adjoining family property. The two sizes add up to the county's 29.24 acres. This match is an inference, because the notes do not give the street number.

In May 2024 the township planning commission recommended conditional approval. It kept the existing 16.5-foot access easement and declined an engineer's suggestion to widen it to 50 feet. No construction, listing or business opening was found for this site.

### What it could mean nearby

- No new homes, buildings or jobs are proposed. The change only moves a property line.
- Access was the main issue discussed. A narrow 16.5-foot easement across the larger lot links the adjoining family's residence to its business on Carlisle Pike.
- Traffic and utility effects are not expected to change, because the records show no new development.

### Where it stands

The county planning commission reviewed the lot addition on 2024-05-15, and the township planning commission recommended conditional approval on 2024-05-20. The township supervisors' final vote was not confirmed. A June 13, 2024 supervisors' agenda listed the plan for review and approval, but the minutes could not be read. After approval, the plan is normally signed and recorded with the county.

- **Jun 13, 2024** Township supervisors' agenda listed the subdivision for review and approval (outcome not confirmed)
- **May 20, 2024** Township planning commission recommended conditional approval and kept the 16.5-foot easement
- **May 15, 2024** County planning commission reviewed the lot addition
- **Apr 22, 2024** Township planning commission first discussed the lot addition and its access

### Around the web

- [Huntington Township Planning Commission minutes, May 20, 2024](https://huntingtontwp.net/wp-content/uploads/2025/02/May-05.20.24.docx) — Huntington Township · May 20, 2024Official township minutes for the meeting where the lot addition was considered.
- [Board of Supervisors June 13, 2024](https://huntingtontwp.net/wp-content/uploads/2024/12/June-13th-2024.pdf) — Huntington Township · Jun 13, 2024Agenda listing the subdivision for review and approval, without a recorded outcome.
- [Huntington Township Planning Commission, April 22, 2024](https://huntingtontwp.net/wp-content/uploads/2025/02/April222024.docx) — Huntington Township · Apr 22, 2024Earlier discussion of the lot addition and the access question.
- [Adams County Planning Commission](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission) — Adams County · May 15, 2024Lists the May 15, 2024 county meeting that reviewed the lot addition.

Planning terms explained

- **Lot line change / lot addition:** Moving a property boundary so that land from one parcel is added to a neighboring parcel, without creating a new building lot.
- **Easement:** A legal right for someone to cross or use part of another person's land, such as a shared driveway.
- **Right-of-way:** A strip of land set aside for access, such as a road or driveway.
- **AC/CI:** The zoning district shown in the county record for the parent site. The records do not spell out the abbreviation.
- **Conditional approval:** Approval that depends on the applicant meeting listed conditions.

Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Huntington Township Board of Supervisors makes the final decision on subdivisions, and residents can contact the township office or attend its public meetings.

In Pennsylvania, Huntington decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Huntington planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Huntington manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Huntington's meeting agendas →](https://www.google.com/search?q=Huntington+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Subdivision of 80-acre lot into five lots](https://plannednearby.com/x/adams-sld-25-060) — same area · agricultural · Huntington Township · filed 2026-01-21
- [Subdivision partly in Huntington Twp (Cumberland Co.)](https://plannednearby.com/x/adams-sld-25-054) — same area · subdivision (use not stated) · Huntington Township · filed 2025-10-15
- [Single-family dwelling and garages](https://plannednearby.com/x/adams-single-family-dwelling-and-garages-c80d72) — same area · 1 home, single-family homes · Huntington Township · filed 2025-08-20
- [Accessory storage yard building, 7051 Old Harrisburg Rd](https://plannednearby.com/x/adams-2024-08-accessory-storage-yard-building-7051-old) — same area · warehouse & storage · Huntington Township · filed 2024-08-21
- [Lot addition of ~2 acres to residential lot](https://plannednearby.com/x/adams-sld-23-105) — same area · lot line change · Huntington Township · filed 2024-02-21
- [Storage yard and accessory building, Huntington](https://plannednearby.com/x/adams-2024-09-storage-yard-and-accessory-building-hunt) — same area · industrial · Huntington Township · filed 2024-09-18

[See everything nearby on a map →](https://plannednearby.com/near#40.00191,-77.16302,Huntington)

---

Source page: https://plannednearby.com/x/adams-sld-24-018

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
