Adams County · Union · #SLD-24-030
Utility lot beside transmission line on Basehoar Rd
Basehoar Rd, Union, PA · government & utilities · 100.9 acres
In short: Utility lot beside transmission line on Basehoar Rd is a government or utility project in Union, Adams County, PA. The site is 100.9 acres. As of November 24, 2026, it is under construction according to web research. Latest record: FirstEnergy's August 2025 announcement says the East Germantown substation and 115-kV line project was under way and due to be energized by the end of March… What usually happens next: completion and occupancy.
Usually next: completion and occupancy.
About this project
Creates a lot next to an existing transmission line for public utility purposes on Basehoar Road. The 101-acre parcel is zoned AG.
- Applicant
- George Allen Basehoar Revocable Trust
- Plan type
- Infrastructure lot
- Land use
- other
- Zoning
- AG
Project history
- 2024-05-15 · #SLD-24-030 · Infrastructure lot
Map pin is approximate.
The full picture AI research · Nov 17, 2026
The county record describes a roughly 101-acre farm-zoned parcel on Basehoar Road in Union Township. A lot would be created beside an existing high-voltage transmission line for public utility use. The county planning commission reviewed it on 2024-05-15.
The lot appears to be the site of a new electric substation. FirstEnergy filings place the proposed East Germantown Substation on Basehoar Road in Union Township. Met-Ed, a FirstEnergy utility, is building it with a new 115-kilovolt line to the existing Germantown Substation. The utility announced in August 2025 that work was under way. It targeted energizing by the end of March 2026, and local news later said before summer 2026. The aim is a second power source for the Littlestown area after a June 2025 outage.
No source names the trust's parcel or confirms the substation is energized. The match to this lot rests on the road and municipality.
What it could mean nearby
- A second power source for the area could shorten outages. FirstEnergy says the project serves about 2,300 customers.
- Construction traffic and vegetation clearing along the new line route are likely. The company says restoration work continues into 2026.
- The land stays in a utility use, not homes or shops, so few new jobs or students are expected.
Where it stands
The lot was reviewed by the county planning commission in May 2024. Utility announcements from August 2025 say construction of the substation and line was under way. Next would be energizing and site restoration, but no source confirms completion.
- Mar 2026 Target date to build and energize the substation, per the August 2025 announcement
- Aug 27, 2025 FirstEnergy announces the Adams County reliability project is under way
- Jun 2025 Transformer failure at the existing Germantown substation causes a multi-day outage
- May 15, 2024 County planning commission reviews the utility lot on Basehoar Road
Who's behind it
Met-Ed (FirstEnergy) · Met-Ed is a Pennsylvania electric utility owned by FirstEnergy. It builds and runs the local power lines and substations. The county filing itself names only the landowner trust.
Around the web
- Big Reliability Boost Coming to Adams CountyFirstEnergy · Aug 27, 2025The East Germantown substation and 115-kV line project was under way, with energizing targeted for the end of March 2026.
- Littlestown power substation expected to be operationalHanover Evening Sun via Yahoo · Aug 27, 2025The new substation is off Basehoar Road northeast of Littlestown, with Met-Ed expecting it energized before summer 2026.
- East Germantown-Germantown Reliability ProjectFirstEnergy · Jul 21, 2025The page describes the 115-kV line from the Germantown Substation to the East Germantown Substation, but does not give a schedule.
- East Germantown notice of filingFirstEnergyThe filing places the proposed substation on Basehoar Road in Union Township, with the line running northwest.
- Adams County Planning CommissionAdams County · May 15, 2024This page lists the May 15, 2024 meeting packet and minutes. The text of those documents could not be read here.
Planning terms explained
- Substation
- A facility that steps electricity between voltage levels and routes it onto local lines.
- Transmission line
- A high-voltage line that carries power over long distances.
- AG zoning
- A zoning district meant mainly for farming and rural land uses.
- Subdivision
- Dividing a parcel to create a new lot, here for a utility use.
Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Pennsylvania Public Utility Commission handles the utility's transmission filings, and Union Township and the county planning office handle local subdivision matters. No open comment period was found.
In Pennsylvania, Union decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Union planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Union manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Union's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- 1-lot residential subdivision on Basehoar Rdsame area · 1 home, single-family homes · Union Township · filed 2024-03-20
- Dairy, heifer, and horse barns on Basehoar School Rdsame area · 44,920 sq ft non-residential, agricultural · Union Township · filed 2026-01-21
- New 2-acre lot and lot reconfiguration, Union Twpsame area · 1 home, single-family homes · Union Township · filed 2026-01-21
- Residential lot subdivision with bank barnsame area · lot line change · Union Township · filed 2025-08-20
- Subdivision of two ag lots into smaller ag lotssame area · agricultural · Union Township · filed 2026-01-21
- Half-acre lot addition on Mummert Dr, Unionsame area · lot line change · Union Township · filed 2024-11-20