[Adams County](https://plannednearby.com/c/adams-pa/) · [Liberty Township](https://plannednearby.com/c/adams-pa/liberty-township) · #SLD-24-054

# Raven Rock Mountain Complex operations building

Liberty Township, PA · 15,680 sq ft non-residential, institutional

In short: **Raven Rock Mountain Complex operations building** is an institutional project in Liberty Township, Adams County, PA. It would add 15,680 sq ft of non-residential space. Its estimated construction value is about $5.5M, a rough estimate from its size. As of November 24, 2026, the public records we track show nothing newer since August 21, 2024. The town may have acted since.

Stage: No recent records · Latest record we have · Aug 21, 2024

The public records we track show nothing newer in over two years. The town may have acted since: local decisions don't always reach these records.

## About this project

Construction of a new operations building of about 15,680 square feet and a parking area at the Raven Rock Mountain Complex in Liberty Township. The agenda does not list the site location or acreage. The site is zoned C.

- **Plan type:** Institutional land development
- **Land use:** institutional
- **Zoning:** C

## Project history

- **2024-08-21** · #SLD-24-054 · Institutional land development · 15,680 sq ft

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

The U.S. military plans a new operations building of about 15,680 square feet, plus a parking area, at the Raven Rock Mountain Complex. This is a secure federal installation near the Liberty Township and Hamiltonban Township line. The county agenda does not give the site location or acreage.

The township planning commission looked at the land development plan several times in 2024. A search summary of the August 2024 minutes says the building, parking and stormwater area would sit mostly in neighboring Hamiltonban Township, with only minimal grading in Liberty Township. The commission voted unanimously on a recommendation. That summary could not be checked against the original scanned minutes.

Federal notices from 2025 describe an Operations Facility project at the complex, but they describe it as an addition and renovation. No news coverage, opposition or construction start was found. The notices may or may not be the same project.

### What it could mean nearby

- The August 2024 minutes, as summarized in a search result, put most of the building and parking in Hamiltonban Township, so most site effects would fall outside Liberty Township.
- No traffic, job or utility figures were found for this building.
- Stormwater management is part of the plan, according to the same summary.

### Where it stands

The last county filing, on 2024-08-21, follows a planning commission recommendation on the plan. No final approval, permit or construction start was found. After plan review, a project like this would normally move to a final decision, then permits and construction. Note: Federal budget and bid notices describe an Operations Facility addition and renovation of about 7,917 square feet, which may be a different project from the 15,680-square-foot new building in county records. The 2024 township minutes also place most of the building in Hamiltonban Township.

- **Oct 2025** A federal sources-sought notice for construction of the Raven Rock Operations Facility closed, per aggregator listings.
- **Sep 2025** The Army Corps of Engineers Baltimore District issued a brand-name notice of intent for the Operations Facility.
- **Dec 2024** The planning commission agenda noted an extension of the plan review period.
- **Aug 21, 2024** Latest county filing.
- **Aug 20, 2024** The planning commission voted unanimously on a recommendation on the Raven Rock land development plan.
- **May 2024** The planning commission recommended extending the time to review the plan.

### Who's behind it

U.S. Department of Defense (Washington Headquarters Services, with the Army Corps of Engineers Baltimore District managing federal construction notices) · Federal agencies that operate and build facilities at the Raven Rock Mountain Complex, a military continuity-of-operations site.

### Around the web

- [2024 Aug 20 PC Minutes](https://liberty.adamscountypa.gov/getmedia/5655ef12-9213-4510-9da0-155c9f48613c/2024-Aug-20-PC-Minutes.pdf) — Liberty Township · Aug 20, 2024A search summary of these minutes reports a unanimous recommendation on the Raven Rock plan, with the building mostly in Hamiltonban Township.
- [Sources Sought: Raven Rock Mountain Complex (RRMC) Operations Facility](https://samsearch.co/gov-explore/federal/sources-sought-raven-rock-mountain-complex-rrmc-operations-facility/W912DR26RA0004-1) — SamSearch · Oct 3, 2025A federal notice sought contractors for construction and renovation of the Operations Facility in Adams County.
- [13 Washington Headquarters Services](https://comptroller.war.gov/Portals/45/Documents/defbudget/FY2026/budget_justification/pdfs/07_Military_Construction/13-Washington_Headquarters_Services.pdf) — U.S. Department of Defense Comptroller · Jun 2025The FY2026 budget lists an Operations Facility addition and renovation at the complex.
- [2024 June 18 Planning Commission Agenda](https://libertytwpadamspa.gov/getmedia/4898ac2a-3a90-457e-aea3-aed5712bd8ee/2024-June-18-Planning-Commission-Agenda.pdf) — Liberty Township · Jun 18, 2024The agenda noted that no updated plans had been received.

Planning terms explained

- **Land development plan:** A detailed site plan showing buildings, parking and stormwater controls, which the township reviews before work starts.
- **Planning commission:** A local advisory board that reviews plans and recommends action to the elected supervisors.
- **Stormwater management:** Features that collect and slow rain runoff so it does not flood or pollute neighboring land.
- **Sources sought:** A federal notice asking contractors whether they could do a planned job.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Liberty Township Planning Commission and Board of Supervisors review the plan, and residents can comment at their public meetings.

In Pennsylvania, Liberty Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Liberty Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Liberty Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Liberty Township's meeting agendas →](https://www.google.com/search?q=Liberty+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$5.5M**

- ~78 roofing squares (assumes 2 stories)
- ~39 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Lot addition to adjacent residential lot](https://plannednearby.com/x/adams-sld-24-010) — same area · lot line change · Liberty Township · filed 2024-03-20
- [Subdivision of 3-acre lot into one new lot](https://plannednearby.com/x/adams-sld-25-074) — same area · 1 home, single-family homes · Liberty Township · filed 2026-01-21
- [Raven Rock public works support facility](https://plannednearby.com/x/adams-sld-24-011) — same area · institutional · Liberty Township · filed 2024-03-20
- [Two kennel buildings at Golden Wood facility](https://plannednearby.com/x/adams-sld-24-013) — same area · 4,044 sq ft non-residential, retail & commercial · Liberty Township · filed 2026-01-21
- [Residential lot subdivision on Harbaugh Valley Rd](https://plannednearby.com/x/adams-sld-24-081) — same area · 3 homes, single-family homes · Liberty Township · filed 2024-12-18
- [Lot reconfiguration along Middle Creek, Liberty Twp](https://plannednearby.com/x/adams-sld-24-053) — same area · lot line change · Liberty Township · filed 2024-08-21

[See everything nearby on a map →](https://plannednearby.com/near#39.73813,-77.40634,Liberty%20Township)

---

Source page: https://plannednearby.com/x/adams-sld-24-054

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
