PlannedNearby

Adams County · Hamilton Township · #SLD-24-077

Pennwood Products manufacturing lot, Hamilton

Rt 194 North, Hamilton Township, PA · 103,500 sq ft non-residential, industrial

In short: Pennwood Products manufacturing lot, Hamilton is an industrial development in Hamilton Township, Adams County, PA. It would add 103,500 sq ft of non-residential space. Its estimated construction value is about $13.5M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Hamilton Township Planning Commission: subdivision plan review (November 17, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

In review Hamilton Township Planning Commission: subdivision plan review · Nov 17, 2026 · source
  1. Proposed
  2. In reviewNov 2024
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: a planning commission recommendation, then a vote by the town's governing body.

About this project

Subdivides two lots from an undeveloped lot. Lot 1 holds a proposed manufacturing facility of about 103,500 sq ft. Zoned C/EI.

Applicant
Pennwood Products
Plan type
Industrial subdivision
Land use
industrial
Zoning
C/EI

Project history

  • 2026-11-17 · Hamilton Township Planning Commission · Subdivision plan review · source
  • 2026-10-20 · Hamilton Township Planning Commission · Lot development review · Tabled · source
  • 2024-11-20 · #SLD-24-077 · Industrial subdivision · 103,500 sq ft

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 7, 2026

Pennwood Products, a maker of prefinished hardwood moldings based in nearby East Berlin, has filed plans for a new manufacturing building of about 103,500 square feet. The site is on Route 194 North in Hamilton Township. The plan splits two lots from an undeveloped parcel, and the factory would sit on Lot 1. The land is zoned C/EI.

Township planning commission records from 2023 show an early concept for a facility on a much larger tract of about 125 acres, with talks involving PennDOT and East Berlin Borough. The 2024 and 2025 records show a traffic study and a land development plan under review. The township supervisors tabled the project in July 2025 while a stormwater pond waiver was pending. The planning commission tabled it again in December 2025 because revised plans arrived too late to review.

No news coverage, groundbreaking or construction was found. Nothing found shows the site has been built on.

What it could mean nearby

Where it stands

The plan is still under review. The latest records found show it tabled by the township planning commission in December 2025, with no approval found. After review, the township would normally approve or deny the plan. Stormwater and other state permits and building permits would follow before construction.

Who's behind it

Pennwood Products · A family-founded East Berlin, PA manufacturer, started in 1942, that makes prefinished hardwood moldings, thin strip flooring and wood fuel pellets.

Around the web

Planning terms explained
Subdivision
Dividing one parcel of land into two or more separate lots.
Land development plan
A detailed site plan showing the building, parking, access and drainage, which the township must approve.
Traffic impact study
A report estimating how many added vehicles a project will generate and what road changes may be needed.
Tabled
Put off to a later meeting without a decision.
Waiver
Permission to depart from a specific township rule, such as a stormwater design standard.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Hamilton Township planning commission reviews the plan and the township supervisors decide, so residents can comment at their public meetings or through the township office.

In Pennsylvania, Hamilton Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Hamilton Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Estimated construction value: $13.5M

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →