# Pennwood Products manufacturing lot, Hamilton

Rt 194 North, Hamilton Township, PA · 103,500 sq ft non-residential, industrial

In short: **Pennwood Products manufacturing lot, Hamilton** is an industrial development in Hamilton Township, Adams County, PA. It would add 103,500 sq ft of non-residential space. Its estimated construction value is about $13.5M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Hamilton Township Planning Commission: subdivision plan review (November 17, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Hamilton Township Planning Commission: subdivision plan review · Nov 17, 2026 · [source](https://twphamilton.com/wp/wp-content/uploads/November-17-2026-PC-Agenda.pdf)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Subdivides two lots from an undeveloped lot. Lot 1 holds a proposed manufacturing facility of about 103,500 sq ft. Zoned C/EI.

- **Applicant:** Pennwood Products
- **Plan type:** Industrial subdivision
- **Land use:** industrial
- **Zoning:** C/EI

## Project history

- **2026-11-17** · Hamilton Township Planning Commission · Subdivision plan review · [source](https://twphamilton.com/wp/wp-content/uploads/November-17-2026-PC-Agenda.pdf)
- **2026-10-20** · Hamilton Township Planning Commission · Lot development review · **Tabled** · [source](https://twphamilton.com/wp/wp-content/uploads/October-20-2026-Minutes.pdf)
- **2024-11-20** · #SLD-24-077 · Industrial subdivision · 103,500 sq ft

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

Pennwood Products, a maker of prefinished hardwood moldings based in nearby East Berlin, has filed plans for a new manufacturing building of about 103,500 square feet. The site is on Route 194 North in Hamilton Township. The plan splits two lots from an undeveloped parcel, and the factory would sit on Lot 1. The land is zoned C/EI.

Township planning commission records from 2023 show an early concept for a facility on a much larger tract of about 125 acres, with talks involving PennDOT and East Berlin Borough. The 2024 and 2025 records show a traffic study and a land development plan under review. The township supervisors tabled the project in July 2025 while a stormwater pond waiver was pending. The planning commission tabled it again in December 2025 because revised plans arrived too late to review.

No news coverage, groundbreaking or construction was found. Nothing found shows the site has been built on.

### What it could mean nearby

- Traffic: the township planning commission recommended conditional approval of a traffic impact study in September 2025, so truck and employee traffic on Route 194 is under review.
- Stormwater: the supervisors considered a waiver request about the depth of a stormwater pond, so drainage is a live review issue.
- Jobs: a larger factory for an existing local manufacturer could keep or add local jobs, but no job numbers were found.

### Where it stands

The plan is still under review. The latest records found show it tabled by the township planning commission in December 2025, with no approval found. After review, the township would normally approve or deny the plan. Stormwater and other state permits and building permits would follow before construction.

- **Dec 16, 2025** Planning commission tabled the plan; revised plans arrived too late for review
- **Sep 16, 2025** Planning commission recommended conditional approval of the traffic impact study
- **Jul 7, 2025** Township supervisors tabled the item, including a stormwater pond depth waiver request
- **Nov 20, 2024** County filing for the industrial subdivision
- **Oct 15, 2024** Planning commission agenda listed the traffic study and a new land development plan
- **Sep 19, 2023** Concept for a facility on about 125 acres presented to the planning commission

### Who's behind it

Pennwood Products · A family-founded East Berlin, PA manufacturer, started in 1942, that makes prefinished hardwood moldings, thin strip flooring and wood fuel pellets.

### Around the web

- [December 16 2025 PC Minutes](https://twphamilton.com/wp/wp-content/uploads/December-16-2025-PC-Minutes.pdf) — Hamilton Township · Dec 16, 2025Shows the plan tabled again because revised plans came in late.
- [September 16 2025 PC Minutes](https://twphamilton.com/wp/wp-content/uploads/September-16-2025-PC-Minutes.pdf) — Hamilton Township · Sep 16, 2025Shows a recommendation of conditional approval for the traffic impact study.
- [07 07 2025 Regular Meeting Minutes](https://twphamilton.com/wp/wp-content/uploads/07-07-2025-Regular-Meeting-Minutes.pdf) — Hamilton Township · Jul 7, 2025Shows the supervisors tabled the item, including a stormwater pond waiver request.
- [October 15 2024 PC Agenda](https://twphamilton.com/wp/wp-content/uploads/October-15-2024-PC-Agenda.pdf) — Hamilton Township · Oct 15, 2024Lists the traffic study and a new land development plan for Pennwood Products.
- [9 SEPT 19 2023 PC Minutes](https://twphamilton.com/wp/wp-content/uploads/9-SEPT-19-2023-PC-Minutes.pdf) — Hamilton Township · Sep 19, 2023Records the early concept for a facility on about 125 acres, with PennDOT and East Berlin discussions.
- [Pennwood Products company profile](https://gettysburgconnection.org/?p=39898) — Gettysburg ConnectionDescribes the company as a 1942-founded East Berlin maker of hardwood moldings.

Planning terms explained

- **Subdivision:** Dividing one parcel of land into two or more separate lots.
- **Land development plan:** A detailed site plan showing the building, parking, access and drainage, which the township must approve.
- **Traffic impact study:** A report estimating how many added vehicles a project will generate and what road changes may be needed.
- **Tabled:** Put off to a later meeting without a decision.
- **Waiver:** Permission to depart from a specific township rule, such as a stormwater design standard.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Hamilton Township planning commission reviews the plan and the township supervisors decide, so residents can comment at their public meetings or through the township office.

In Pennsylvania, Hamilton Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Hamilton Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Hamilton Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Hamilton Township's meeting agendas →](https://www.google.com/search?q=Hamilton+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$13.5M**

- ~1,035 roofing squares (assumes 1 story)
- ~258 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Ag lot subdivision on Rolling Lane](https://plannednearby.com/x/adams-sld-22-069) — same area · agricultural · Hamilton Township · filed 2026-01-21
- [Reverse subdivision of 2 lots, York Rd](https://plannednearby.com/x/adams-sld-26-006) — same area · lot line change · Hamilton · filed 2026-03-18
- [2 new residential lots from large ag lot](https://plannednearby.com/x/adams-sld-25-043) — same area · 2 homes, single-family homes · Hamilton Township · filed 2025-10-15
- [Lot addition on Mummerts Church Rd](https://plannednearby.com/x/adams-sld-23-101) — same area · lot line change · Hamilton Township · filed 2024-02-21
- [Residential lot subdivision on High St, Abbottstown](https://plannednearby.com/x/adams-sld-24-066) — same area · lot line change · Abbottstown · filed 2024-11-20
- [Addition to commercial building on W King St](https://plannednearby.com/x/adams-sld-25-086) — same area · 5,500 sq ft non-residential, retail & commercial · Abbottstown · filed 2026-01-21

[See everything nearby on a map →](https://plannednearby.com/near#39.89981,-76.99950,Hamilton%20Township)

---

Source page: https://plannednearby.com/x/adams-sld-24-077

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.