Adams County · Mt. Joy Township · #SLD-25-057
Ag lot split into two 20-acre lots
Two Taverns Rd, Mt. Joy Township, PA · 1 home, single-family homes · 40.6 acres
In short: Ag lot split into two 20-acre lots is a single-family home development at Two Taverns Rd in Mt. Joy Township, Adams County, PA. It would add 1 home on 40.6 acres. As of November 24, 2026, it is in review. Latest record: Residential reviewed at a meeting of the county planning commission (October 15, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.
Usually next: a planning commission recommendation, then a vote by the town's governing body.
About this project
Splits an agricultural/residential lot into two lots of about 20 acres each, with a lot addition included. The report lists one new residential lot on a 41-acre site.
- Plan type
- Residential
- Land use
- single-family
- Zoning
- AC
Project history
- 2025-10-15 · #SLD-25-057 · Residential · 1 lots/units
Map pin is approximate.
The full picture AI research · Nov 16, 2026
A landowner on Two Taverns Road in Mt. Joy Township has proposed splitting one farm and residential property of about 41 acres into two lots of roughly 20 acres each. The plan also includes a lot addition, which moves a small piece of land from one parcel to another. County records list one new residential lot, meaning room for one new house. No construction plans were found.
The land is zoned for agriculture and is open farmland or large-lot residential today. No developer or builder is attached to the project. The county lists it as a small private lot split.
The township's October 2025 supervisors' minutes appear to cover a two-lot split on Two Taverns Road. A search summary of those minutes said the land is under a permanent farmland preservation easement. It also said the plan raised legal problems and that a variance might be needed. The PDF text could not be read directly, so this is unconfirmed. No later decision was found.
What it could mean nearby
- Adds at most one new house site, so traffic and school effects would be very small.
- The land would stay mostly open, with two lots of about 20 acres each.
- Both lots would likely use private well and septic, since no public utilities were found for the site.
- If the land is under a preservation easement, the split may not be allowed, which would limit any new building.
Where it stands
The county planning commission reviewed the plan on 2025-10-15. No final township decision, permit or construction was found. The township supervisors or Zoning Hearing Board would typically act next, followed by recording of the plan if it is approved. Note: A search summary of the township's October 2025 minutes described the parcel as about 48 acres, not the county's 40.58, but the PDF could not be read directly to confirm this.
- Oct 16, 2025 Township supervisors' minutes appear to discuss a two-lot split on Two Taverns Road (unverified)
- Oct 15, 2025 County planning commission reviewed the lot split (SLD-25-057)
Around the web
- Adams County Planning CommissionAdams County, PA · Oct 15, 2025Index page listing the October 2025 packet and minutes; it does not name this project.
- October 2025 PacketAdams County, PA · Oct 15, 2025County packet for the October 2025 meeting; its text could not be read directly.
- October 2025 MinutesAdams County, PA · Oct 15, 2025County minutes; the readable part did not show this project.
- BOS Regular October 16 2025 MinutesMount Joy Township · Oct 16, 2025A search summary says these minutes cover a two-lot split on Two Taverns Road, possibly under a preservation easement. The PDF text could not be read directly.
Planning terms explained
- Lot split (subdivision)
- Dividing one property into two or more separate lots that can be sold or built on separately.
- Lot addition
- Moving a strip of land from one property to a neighboring one without creating a new lot.
- Preservation easement
- A permanent legal restriction that keeps farmland from being developed.
- Variance
- Special permission from a township zoning board to depart from a zoning rule.
- Planning commission review
- An advisory review of a plan. It is not the final approval, which the township gives.
Researched by AI from public sources on Nov 16, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Mt. Joy Township supervisors, and possibly its Zoning Hearing Board, decide next, so residents can comment at their public meetings or by contacting the township office.
In Pennsylvania, Mt. Joy Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Mt. Joy Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Mt. Joy Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Mt. Joy Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.