[Adams County](https://plannednearby.com/c/adams-pa/) · [Gettysburg](https://plannednearby.com/c/adams-pa/gettysburg) · #SLD-25-062

# 10 townhouse units on E Water St

351 E Water St, Gettysburg, PA · 10 homes, townhomes · 0.8 acres

In short: **10 townhouse units on E Water St** is a townhome development at 351 E Water St in Gettysburg, Adams County, PA. It would add 10 homes on 0.8 acres. Its estimated construction value is about $3.7M, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Gettysburg Planning Commission: recommendation to deny application (November 12, 2026). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Gettysburg Planning Commission: recommendation to deny application · Nov 12, 2026 · [source](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Agenda/_11122026-222)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Proposes 10 townhouse units, each on an individual lot, on about 0.83 acres. The site is in the R-2 zoning district.

- **Applicant:** [Simrat LLC](https://plannednearby.com/f/simrat-llc)
- **Plan type:** Residential
- **Land use:** townhomes
- **Zoning:** R-2

## Project history

- **2026-11-12** · Gettysburg Planning Commission · Recommendation to deny application · [source](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Agenda/_11122026-222)
- **2026-10-19** · Gettysburg Planning Commission · Old business, status update · [source](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Minutes/_10192026-217)
- **2026-09-30** · Gettysburg Planning Commission · Extension request, tabled old business · [source](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Agenda/_09302026-212)
- **2025-10-15** · #SLD-25-062 · Residential · 10 lots/units

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

Simrat LLC proposes 10 townhouse-style homes at 351 E Water St in Gettysburg. The homes would sit on about 0.83 acres in the R-2 zoning district, each on its own lot. Borough planning staff have reviewed a layout with two multi-unit buildings around a central courtyard and a single driveway onto East Water Street.

The plan has been under review by the borough Planning Commission since September 2025. Housing is allowed at this site under current zoning. The commission has extended its review deadline several times while engineering work and outside agency reviews continue.

In June 2026, owners of two nearby industrial businesses, a coatings maker and a distillery, raised concerns. They worried about noise, truck traffic and operating hours. Commissioners suggested the developer consider soundproofing. No listings, construction reports or sales were found for the site.

### What it could mean nearby

- Access: the revised layout has one entrance onto East Water Street, which may affect traffic on that block.
- Neighbors: nearby manufacturing and distillery businesses are concerned about conflicts with new residents over noise and truck traffic.
- Housing: 10 new homes would be added near downtown Gettysburg.

### Where it stands

The plan is still under review by the Gettysburg Planning Commission. In June 2026 the commission extended its review deadline to August 17, 2026, and no approval or later decision was found. After the commission acts, the plan typically goes to Borough Council for a decision, and construction permits follow only after approval.

- **Jun 15, 2026** Planning Commission extended review (reported to Aug. 17) and heard business neighbors' concerns
- **May 18, 2026** Planning Commission item tabled; staff noted no new materials received
- **Mar 16, 2026** Commission granted a 90-day review extension
- **Feb 2026** Revised site design with courtyard layout presented to the commission
- **Oct 15, 2025** Latest county filing for residential review
- **Sep 15, 2025** Planning Commission began reviewing the major subdivision and land development plan

### Who's behind it

Simrat LLC

### Around the web

- [Gettysburg Planning Commission hears concerns about Water Street housing project](https://gettysburgconnection.org/?p=108459) — Gettysburg Connection · Jun 17, 2026Reports the 10-unit plan, extension to Aug. 17 and concerns from neighboring industrial businesses.
- [Planning Commission agenda, June 15, 2026](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Agenda/_06152026-180) — Gettysburg Borough · Jun 15, 2026Lists an extension item for the Simrat project.
- [Planning Commission agenda, May 18, 2026](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/ArchivedAgenda/_05182026-95) — Gettysburg Borough · May 18, 2026Shows the project as tabled old business with no new materials.
- [Planning Commission minutes, March 16, 2026](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Minutes/_03162026-161) — Gettysburg Borough · Mar 16, 2026Records a 90-day review extension for the plan.
- [Planning Commission agenda, September 15, 2025](https://www.gettysburgpa.gov/AgendaCenter/ViewFile/Agenda/_09152025-57) — Gettysburg Borough · Sep 15, 2025Shows the plan entering review as a major preliminary and final subdivision and land development plan.
- [Property Record, 351 E Water St](https://www.loopnet.com/property/351-e-water-st-gettysburg-pa-17325/42001-16%200070142B000) — LoopNetParcel record only; shows no listing or construction.

Planning terms explained

- **Land development plan:** A detailed site plan showing buildings, parking, driveways and utilities that the borough must approve before construction.
- **Subdivision:** Dividing a parcel into separate lots, here one lot for each townhouse.
- **R-2 zoning district:** A residential zone in the borough's zoning map that allows housing such as townhouses.
- **Review extension:** A developer-agreed delay of the legal deadline for the commission to act, giving time to finish engineering and outside reviews.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Gettysburg Borough Planning Commission is reviewing the plan at its monthly public meetings, and commissioners told neighbors they can also raise concerns with Borough Council.

In Pennsylvania, Gettysburg decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Gettysburg planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Gettysburg manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Gettysburg's meeting agendas →](https://www.google.com/search?q=Gettysburg+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$3.7M**

- ~140 roofing squares
- ~10 HVAC systems
- ~10 kitchens / 20+ bathrooms
- ~20,000 sq ft of finished living space

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Building and unloading area expansion, E Water St](https://plannednearby.com/x/adams-sld-24-046) — same area · 1,116 sq ft non-residential, industrial · Gettysburg Borough · filed 2024-07-17
- [Simrat LLC townhouses on individual lots](https://plannednearby.com/x/adams-simrat-llc-townhouses-on-individual-lots-e26e5f) — same area · townhomes · Gettysburg · filed 2025-10-15
- [Mini golf course with clubhouse, Gettysburg Boro](https://plannednearby.com/x/adams-mini-golf-course-with-clubhouse-gettysbu-8d3737) — same area · recreation · Gettysburg Borough · filed 2024-07-17
- [500 sq ft lot addition in Gettysburg](https://plannednearby.com/x/adams-sld-25-078) — same area · lot line change · Gettysburg · filed 2026-01-21
- [Townhouse units on individual lots, Gettysburg](https://plannednearby.com/x/adams-townhouse-units-on-individual-lots-getty-e26e5f) — same area · townhomes · Gettysburg · filed 2026-01-21
- [Mini golf course with clubhouse on Steinwehr Ave](https://plannednearby.com/x/adams-sld-24-028) — same area · 400 sq ft non-residential, recreation · Gettysburg · filed 2024-05-15

[See everything nearby on a map →](https://plannednearby.com/near#39.83438,-77.22625,Gettysburg)

---

Source page: https://plannednearby.com/x/adams-sld-25-062

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
