[Adams County](https://plannednearby.com/c/adams-pa/) · [Cumberland Township](https://plannednearby.com/c/adams-pa/cumberland-township) · #SLD-25-063

# Parking reconfiguration and building addition

Fairfield Rd, Cumberland Township, PA · 1,605 sq ft non-residential, institutional · 3.8 acres

In short: **Parking reconfiguration and building addition** is an institutional project at Fairfield Rd in Cumberland Township, Adams County, PA. It would add 1,605 sq ft of non-residential space on 3.8 acres. Its estimated construction value is about $562K, a rough estimate from its size. As of November 24, 2026, it is in review. Latest record: Institutional reviewed at a meeting of the county planning commission (October 15, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Institutional reviewed at a meeting of the county planning commission · Oct 15, 2025 · [source](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Reconfigures parking and adds about 1,605 square feet to an institutional facility on a 3.8-acre site.

- **Plan type:** Institutional
- **Land use:** institutional
- **Zoning:** INS

## Project history

- **2025-10-15** · #SLD-25-063 · Institutional · 1,605 sq ft

[County plan review office →](https://www.adamscountypa.gov/departments/officeofplanninganddevelopment/panningcommission)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

The township's planning records describe this as a plan to renovate the Gettysburg Readiness Center on Fairfield Road. The plan adds about 1,600 square feet to the existing building. It also reworks the parking and adds accessibility improvements. The site is about 3.8 acres in the township's Industrial District.

The addition is small. The plan is mainly an upgrade of a building that already stands there. A construction-bid listing for a Gettysburg Readiness Center renovation mentions the 28th Infantry Division Band moving in. That listing gives no street address, so it is not clearly tied to this site.

No news coverage, opposition or construction update was found for this site.

### What it could mean nearby

- The addition is small, so a large rise in traffic is not indicated by the records.
- Parking would be reconfigured on the site, and accessibility improvements are part of the plan.
- The records found do not show new homes, new jobs or school effects.

### Where it stands

County records show the plan in review as of October 2025. The township planning commission took it up on October 9, 2025, and the supervisors' November 25, 2025 agenda listed an approval vote. The outcome of that vote was not confirmed. Permits and construction would usually follow an approval.

- **Nov 25, 2025** Township supervisors' agenda lists approval of the Readiness Center land development plan
- **Oct 15, 2025** Latest county filing: plan filed for county review
- **Oct 9, 2025** Township planning commission considers the plan and is asked for a recommendation

### Around the web

- [11 November 25th Board Mtg](https://cumberlandtwppa.gov/getmedia/b1ef517d-7134-411e-b67e-0d51b628c0c4/11-November-25th-Board-Mtg.pdf) — Cumberland Township · Nov 25, 2025The supervisors' agenda lists approval of the Gettysburg Readiness Center renovation plan, citing the township engineer's November 20, 2025 comment letter.
- [Planning Commission Minutes October 9, 2025](https://www.cumberlandtwppa.gov/getattachment/d3a1f1d2-7437-4200-94eb-0e26851990dd/Planning-Commission-Minutes-October-9,-2025.pdf) — Cumberland Township · Oct 9, 2025The minutes describe a renovation of the Readiness Center on Fairfield Road, with a 1,600 sq ft addition on a 3.77-acre site.
- [Planning Commission Agenda, October 9, 2025](https://www.cumberlandtwppa.gov/getmedia/6fb2afd1-fc48-4ef8-8b40-de5fc8517afb/10-October-9th.pdf) — Cumberland Township · Oct 9, 2025The agenda lists the Readiness Center land development plan for a recommendation to the supervisors.

Planning terms explained

- **Land development plan:** A formal site plan the township reviews when a property is expanded or changed, covering buildings, parking and drainage.
- **Planning commission:** A volunteer township board that reviews plans and recommends to the supervisors whether to approve them.
- **Industrial District:** A zoning area where the township allows industrial and similar uses.
- **Institutional use:** A non-residential use by a public or community organization rather than a store or office.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Cumberland Township Board of Supervisors makes the final decision on land development plans, and residents can comment at its regular public meetings or through the township office.

In Pennsylvania, Cumberland Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Cumberland Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Cumberland Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Cumberland Township's meeting agendas →](https://www.google.com/search?q=Cumberland+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$562K**

- ~8 roofing squares (assumes 2 stories)
- ~4 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [154-unit single-family development, The Crossings](https://plannednearby.com/x/adams-2024-03-154-unit-single-family-development-the-c) — same area · 151 homes, single-family homes · Cumberland Township · filed 2024-03-20
- [15-lot subdivision in Cumberland Township](https://plannednearby.com/x/adams-2024-07-15-lot-subdivision-in-cumberland-townshi) — same area · subdivision (use not stated) · Cumberland Township · filed 2024-07-17
- [Residential subdivision on property with LCAC easement](https://plannednearby.com/x/adams-residential-subdivision-on-property-with-b218b6) — same area · single-family homes · Cumberland Township · filed 2024-03-20
- [Wellhouse on GMA easement, Blacksmith Shop Rd](https://plannednearby.com/x/adams-sld-24-036) — same area · 803 sq ft non-residential, retail & commercial · Cumberland Township · filed 2024-07-17
- [Well treatment building, Cumberland Twp](https://plannednearby.com/x/adams-2024-08-well-treatment-building-cumberland-twp) — same area · other · Cumberland Township · filed 2024-08-21
- [Subdivision of 70-acre lot into 4 mixed-use lots](https://plannednearby.com/x/adams-sld-25-073) — same area · mixed use · Cumberland Township · filed 2026-01-21

[See everything nearby on a map →](https://plannednearby.com/near#39.80110,-77.24917,Cumberland%20Township)

---

Source page: https://plannednearby.com/x/adams-sld-25-063

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
