Berks County · Bern Township · #07-12049c
Eagle Metals
North of Old Bernville Road and west of Fairview Drive. The intersection of Old Bernville Road and Fairview Drive is located southeast of the tract., Bern Township, PA · 24,202 sq ft non-residential, industrial · 8.1 acres
About this project
A preliminary land development in Bern Township that adds a 24,202-square-foot building addition and a stormwater facility to an 8-acre industrial site north of Old Bernville Road, and annexes three parcels.
Official description: Annexation of parcels A,B, and C. The proposal also includes the construction of a 24,202 square foot building addition, along with a proposed swm facility.
- Applicant
- Charles Bernard
- Owner
- Eagle Metals, f/k/a, Eagle Brass Company
- Engineer / designer
- Nick Perilli
- Plan type
- Preliminary Land Development
- Land use
- Industrial
- Water
- Existing On Lot
- Sewer
- Existing On Lot
- Status
- Reviewed
Filing history
- 2026-08-27 · #07-12049c · Preliminary Land Development · 24,202 sq ft
- 2025-09-26 · #07-12049b · Preliminary · 1,575 sq ft
The full picture AI research · Nov 2, 2026
Eagle Metals, a metal rolling and processing company in Bern Township, has asked the township and county to review a plan to enlarge its industrial site. The plan adds a building addition of about 24,200 square feet and a new stormwater facility. The site is about 8 acres, north of Old Bernville Road and west of Fairview Drive. The plan would also annex (fold in) three neighboring parcels.
The site is already an industrial property. A chamber of commerce profile describes the company as a maker of thin metal coils, strips and sheets in the Leesport area. The records point to an expansion of an existing operation, not a new use on undeveloped land.
No news coverage, opposition, or approval decisions were found. The only online items found were a Bern Township planning commission agenda and a county planning report that list the plan by name.
What it could mean nearby
- The stormwater facility is meant to manage runoff from the added building and paved areas.
- Truck or employee traffic on Old Bernville Road could change, but no traffic study or figures were found.
- Annexing three parcels would merge them into the industrial site, which could change how that land is used.
Where it stands
The plan is at the preliminary land development stage, and the latest county filing is dated 2026-08-27. Next come reviews by the county and township planning bodies, then a vote by the township supervisors. A final plan with engineering details usually follows.
- Aug 27, 2026 Latest county filing for the preliminary land development
- Oct 14, 2025 Bern Township planning commission agenda lists an Eagle Metals subdivision/land development item
- Sep 2025 Berks County planning report (Sept–Oct 2025) lists the Eagle Metals preliminary plan
Want to weigh in? The Bern Township planning commission and board of supervisors review land development plans at public meetings, and residents can comment there or contact the township office.
Who's behind it
Eagle Metals (formerly Eagle Brass Company) · A precision metal re-roll producer in the Leesport area of Berks County, making thin coils, strips and sheets in many alloys, including copper-based ones.
Around the web
- Eagle Metals sees value in GRCA membership during pandemicGreater Reading Chamber AllianceDescribes the company as a maker of light-gauge metal coils, strips and sheets in the Leesport area.
- 2025 09 Sep to Oct ReportsBerks County Planning Commission · Oct 1, 2025Lists the Eagle Metals preliminary plan north of Old Bernville Road and west of Fairview Drive.
Planning terms explained
- Preliminary land development
- An early formal review of a site plan, before the detailed final plan is approved.
- Annexation
- Combining neighboring parcels into the project's property.
- Stormwater facility
- A basin or similar system that collects and slows rainwater runoff from buildings and pavement.
- Re-roll mill
- A factory that rolls metal into thinner strips, coils or sheets.
Researched by AI from public sources on Nov 2, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.1M
- ~242 roofing squares (assumes 1 story)
- ~60 tons of cooling (rule of thumb 400 sq ft/ton)