PlannedNearby

Berks County · Birdsboro Borough · #10-12912a

Total Recycle 2

North side of Armorcast Road approximately 1,500-feet west of the intersection with N. Furnace Street., Birdsboro Borough, PA · 140,782 sq ft non-residential, industrial · 63.5 acres

About this project

A sketch plan for a waste recycling center on about 63.5 acres north of Armorcast Road in Birdsboro Borough, with a proposed building of roughly 140,800 sq ft.

Official description: Waste recycling center

Applicant
TotalRecycle, Inc.
Owner
IDA Inc.
Developer
TotalRecycle, Inc.
Engineer / designer
Dawood Engineering, Inc.
Plan type
Sketch
Land use
Industrial
Water
P
Sewer
P
Status
Reviewed

Filing history

  • 2024-07-15 · #10-12912a · Sketch · 140,782 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

TotalRecycle, Inc. has filed an early-stage sketch plan for a waste recycling center on about 63.5 acres on the north side of Armorcast Road in Birdsboro Borough, Berks County. It is roughly 1,500 feet west of N. Furnace Street.

The plan shows one building of about 140,800 square feet, which is a little larger than two and a half football fields. The county classes it as industrial. The records don't say what the land is used for today.

A sketch plan is an informal first look. It lets the borough give feedback before the developer pays for detailed engineering drawings. No news coverage, meeting minutes, hearing notices or permits specific to this project were found online. Details such as the materials handled, truck volumes and operating hours are not public yet.

What it could mean nearby

Where it stands

The project is at the sketch plan stage, with the latest county filing on 2024-07-15, and no approvals were found. A formal land development application normally comes next, followed by borough planning commission and council review and state environmental permits.

Want to weigh in? Birdsboro Borough's planning commission and borough council would review a formal plan, and residents can usually comment at their public meetings. The council has been reported to meet on the third Monday of each month at 7pm.

Who's behind it

TotalRecycle, Inc. · The county filing names it as the applicant, with IDA Inc. and Dawood Engineering, Inc. also listed on the filing. No official company page for this project was confirmed.

Planning terms explained
Sketch plan
An early, informal drawing shown to the municipality for feedback before a formal application is filed.
Land development
The formal approval process for building or expanding non-residential buildings and site improvements.
Industrial
A land-use category for manufacturing, processing, warehousing and similar operations.
Planning commission
A local advisory board that reviews development plans and makes recommendations to the governing body.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $18.3M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →