Berks County · Centerport Borough · #14-13827
Dollar General - Centerport, PA
Northeast of Main Street (S.R. 4026) and Maple Street intersection., Centerport Borough, PA · 10,640 sq ft non-residential, retail & commercial · 1.2 acres
About this project
Final plan for a 10,640 square foot Dollar General retail store with parking and related amenities on 1.19 acres northeast of Main Street and Maple Street in Centerport Borough.
Official description: Construct a 10,640 ft2 commercial retail store along w/parking and other amenities
- Applicant
- PTV 1337, LLC
- Owner
- Centerport Milk Hauling Cooperative
- Engineer / designer
- Larson Design Group
- Plan type
- Final
- Land use
- Commercial
- Water
- OL
- Sewer
- P
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
A Dollar General store is proposed in Centerport Borough, Berks County. The county filing describes a final plan for a one-story retail building of about 10,640 square feet, with parking and related site improvements. It would sit on about 1.19 acres at the northeast corner of Main Street (S.R. 4026) and Maple Street.
The filing lists PTV 1337, LLC, Centerport Milk Hauling Cooperative, and Larson Design Group. The filing does not say who owns which role. A common arrangement is that a development company buys or leases the land, an engineering firm prepares the plans, and the current landowner sells the site. The records do not confirm any of this. They also do not describe what is on the site now.
No news coverage, borough meeting minutes, hearing notices, or developer project page was found for this project. Whether anyone supports or opposes it is unknown.
What it could mean nearby
- Traffic and driveway access onto Main Street, a state-numbered road, would likely be reviewed, but no traffic study was found.
- A retail store of this size typically brings a small number of part-time and full-time jobs, though no staffing figures were published.
- Adding paved parking and a building on 1.19 acres would change how stormwater drains, so the plan would normally include stormwater controls.
Where it stands
As of the latest county filing on 2024-04-10, the project was at the final plan stage. After final plan approval, developers usually need to meet any conditions, obtain permits such as a state highway access permit, and then begin construction. No later approval or construction status was found online.
- Apr 10, 2024 Latest county filing: final plan for the Dollar General store
Want to weigh in? Final plans are normally decided by the Centerport Borough council after review by the borough planning commission, and residents can usually comment at public meetings. Contact the borough office for the current schedule.
Who's behind it
PTV 1337, LLC
Planning terms explained
- Final plan
- The detailed version of a development plan submitted for formal approval before construction can start.
- Land development
- A formal review process for building on a property, covering things like parking, drainage and access.
- S.R. 4026
- A State Route number, meaning Main Street is a state-maintained road, so driveway access is usually reviewed by PennDOT.
- Non-residential square footage
- The floor area of buildings that are not homes, such as shops or offices.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $2.3M
- ~106 roofing squares (assumes 1 story)
- ~26 tons of cooling (rule of thumb 400 sq ft/ton)