Berks County · Maidencreek Township · #37-13859
Heeby's Surplus Land Development
South of Park Road (SR 1010), between the intersections of W. Wesner Road to the east and Dries Road to the west., Maidencreek Township, PA · 29,400 sq ft non-residential, warehouse & storage · 10.0 acres
About this project
A final land development for a 29,400 sq ft storage building on about 10 acres south of Park Road (SR 1010), between Wesner and Dries roads in Maidencreek Township.
Official description: Construct a 29,400 ft2 storage building.
- Engineer / designer
- Berks Surveying & Engineering, Inc.
- Plan type
- Final
- Land use
- Commercial
- Water
- P
- Sewer
- P
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
Heeby's Surplus Land Development proposes a single storage building of about 29,400 square feet on roughly 10 acres south of Park Road (SR 1010) in Maidencreek Township. The site lies between Wesner Road to the east and Dries Road to the west. The county filing is a final land development plan, which is the last detailed engineering review before construction can be permitted.
Township meeting minutes from spring 2024 describe a Heeby's proposal to replace older storage trailers with a building. Minutes also show the township planning commission recommended the conditional use request in March 2024. The supervisors then approved it in April 2024 by unanimous vote, with conditions. One condition was that the applicant finish the land development approval process. The applicant must also meet township rules on zoning, stormwater and building codes.
The minutes could not be read in full, so they are matched to this site by name and township only. No news coverage, opposition or named occupant was found.
What it could mean nearby
- Storage use is likely to bring modest traffic, mainly on Park Road (SR 1010), a state road; the records give no traffic counts.
- The building adds about 29,400 sq ft of non-residential space. No new homes are proposed, and no job estimate was found.
- Township discussion covered parking and stormwater runoff and water quality, so drainage controls are expected to be part of the plan.
Where it stands
The township granted conditional use approval in April 2024, and the county shows a final land development filing dated 2024-08-26. Next come township review and a vote on the final plan, then permits and construction. No final approval was found in the sources reviewed.
- Aug 26, 2024 Latest county filing for the final land development plan
- Apr 11, 2024 Township supervisors approved the conditional use with conditions
- Mar 6, 2024 Township planning commission recommended the conditional use
Want to weigh in? The Maidencreek Township Board of Supervisors decides on land development plans, and residents can comment at its public meetings or in writing to the township.
Who's behind it
Heeby's · The applicant named in township minutes as Heeby's; the plan's engineering firm is Berks Surveying & Engineering, Inc.
Around the web
- 4 11 24 minute 1Maidencreek Township · Apr 11, 2024Supervisors approved Heeby's conditional use unanimously, subject to completing land development approval and meeting township codes.
- 3 6 24 minute 1Maidencreek Township · Mar 6, 2024Planning commission discussed replacing old storage trailers with a building, covering parking and stormwater, and recommended the conditional use.
Planning terms explained
- Final land development
- The last detailed plan review for a project, covering the building, parking, drainage and utilities before permits are issued.
- Conditional use
- A use the zoning code allows only if the supervisors hold a hearing and the applicant meets set conditions.
- Stormwater
- Rain and runoff from roofs and pavement, which a project must manage so it does not flood neighbors or pollute streams.
- SALDO
- The Subdivision and Land Development Ordinance, the township's rules for how land is divided and built on.
- SR 1010
- The state route number for Park Road, which means PennDOT controls access to it.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.8M
- ~294 roofing squares (assumes 1 story)
- ~73 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →