Berks County · Ontelaunee Township · #45-11338b
Cambridge-Lee Industries building addition
West side of Berkley Road approximately 800-feet northwest of the intersection with Pottsville Pike (S.R.0061)., Ontelaunee Township, PA · 49,400 sq ft non-residential, industrial · 100.5 acres
About this project
A preliminary plan for a roughly 49,400 sq ft industrial building addition, with new paved areas and site work, on about 100 acres in Ontelaunee Township along Berkley Road.
Official description: Building addition, additional paved areas & other site improvements
- Applicant
- Cambridge-Lee Industries LLC; Matt Rader
- Owner
- Cambridge-Lee Industries LLC
- Developer
- Cambridge-Lee Industries LLC
- Engineer / designer
- C2C Design Group, Attn: Larry Grybosky, P.E.
- Plan type
- Preliminary
- Land use
- Industrial
- Water
- EX P
- Sewer
- EX P
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
Cambridge-Lee Industries, a manufacturer with an existing industrial site on Berkley Road in Ontelaunee Township, has filed a preliminary plan to add a building of about 49,400 square feet. The plan also includes new paved areas and other site work.
The property is one existing industrial lot of about 100.5 acres. Only about 4 acres would be disturbed or developed, so most of the land would stay as it is. The county report lists the site as already served by existing public sewer and water.
No news coverage, township meeting minutes, opposition or approvals were found online. The county planning report is the only public source that was found, and no information turned up on what the addition will be used for.
What it could mean nearby
- Only about 4 of 100.5 acres would be developed, so most of the site would stay undeveloped.
- The site already has public sewer and water, so new utility lines should not be needed.
- Traffic, jobs and school effects are not described in the available records.
Where it stands
A preliminary plan was filed with the county and reviewed in the county planning commission's January to February 2026 report cycle. No township approval was found. Usually the township planning commission and supervisors review the plan next, and a final plan follows.
- Jan 29, 2026 Latest county filing for the preliminary plan
Want to weigh in? The Ontelaunee Township planning commission and board of supervisors decide on the plan, and residents can usually comment at their public meetings; check the township for agendas.
Who's behind it
Cambridge-Lee Industries LLC · A company with an existing industrial operation on this Berks County site; no other details were confirmed by the sources found.
Around the web
- 2026 01 Jan to Feb ReportsBerks County Planning Commission · Feb 19, 2026Lists the Cambridge-Lee preliminary plan: one industrial lot, 49,400 sq ft proposed, about 4 of 100.5 acres developed, with existing sewer and water.
Planning terms explained
- Preliminary plan
- A detailed early-stage site plan that the township reviews before the developer submits the final version for approval.
- Land development
- Construction of a new building or major site changes, which requires township review.
- Berks County Planning Commission
- A county body that reviews local plans and gives advice, but the township makes the final decision.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $6.4M
- ~494 roofing squares (assumes 1 story)
- ~123 tons of cooling (rule of thumb 400 sq ft/ton)
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →