Berks County · Ruscombmanor Township · #54-13934

BW Training Stables - 51 Club Lane

Northside of Sand Hill Road (T-566, Public). The parcel is traversed by Gun Club Lane, and Moser Lane is located south of the site., Ruscombmanor Township, PA · 26,912 sq ft non-residential, agricultural · 30.4 acres

About this project

A preliminary final plan for an accessory horse stable building of about 26,912 square feet on about 30.4 acres on Sand Hill Road in Ruscombmanor Township, Berks County.

Official description: Construction of an accessory agricultural building (horse stable) approximately 26,912 square feet.

Engineer / designer
Bradford R. Grauel, PLS
Plan type
Preliminary Final
Land use
Commercial
Water
OL
Sewer
OL
Status
Reviewed

Filing history

  • 2025-10-01 · #54-13934 · Preliminary Final · 26,912 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

A preliminary final plan has been filed for an accessory horse stable building of about 26,912 square feet. It would sit on a parcel of about 30.4 acres on the north side of Sand Hill Road in Ruscombmanor Township, Berks County. The county lists the project as agricultural, and the site plan was prepared by a land surveying firm.

The county records do not say what the land is used for now, who will operate the stable, or whether horses will be boarded or trained there. The project name suggests a horse-training use, but the records do not confirm that. No news coverage, township meeting items or developer web pages about this project were found.

What it could mean nearby

Where it stands

A preliminary final plan was filed with the county on 2025-10-01. The township planning commission and supervisors usually review it next. The plan is then approved, conditionally approved or denied, and the stable can be built after any required permits are issued.

Want to weigh in? Ruscombmanor Township's planning commission and Board of Supervisors would normally review the plan at public meetings. Residents can ask the township office for agendas and comment times.

Planning terms explained
Preliminary final plan
A detailed site plan submitted to the township and county for review before the final approved version.
Accessory building
A structure that supports the main use of a property, such as a barn or stable on a farm.
Land development plan
A plan showing how a site will be built on, including buildings, access, drainage and utilities.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.