Berks County · South Heidelberg Township · #58-12627d
0 Krick Lane
Eastern side of Krick Lane at the intersection with Mellowbrook Drive., South Heidelberg Township, PA · 409,380 sq ft non-residential, warehouse & storage · 38.3 acres
About this project
A preliminary plan for a roughly 409,380-square-foot warehouse with parking and truck facilities on about 38.3 acres on the east side of Krick Lane in South Heidelberg Township.
Official description: Warehouse w/ associated parking & truck facilities
- Applicant
- C&B Development, LLC
- Owner
- Henry J. and Amy Noss
- Developer
- C&B Development, LLC
- Engineer / designer
- Benchmarck Civil Engineering Services, Inc.
- Plan type
- Preliminary
- Land use
- Industrial
- Water
- P
- Sewer
- P
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
The developer proposes one warehouse of about 409,380 square feet, with parking and truck loading areas. It would sit on roughly 38 acres on the east side of Krick Lane in South Heidelberg Township, near Mellowbrook Drive. That is about the area of 29 football fields.
Press coverage describes the land as undeveloped and currently farmed. The township planning commission has recommended approval of the plan. The article copy found online has no visible date. The main dispute was a truck driveway onto Krick Lane. Residents of a nearby development of about 60 homes raised concerns. Township officials argued the layout was the safest option for the site. No end user or tenant was identified.
What it could mean nearby
- Truck traffic and the location of the truck driveway on Krick Lane were the main concerns raised, especially by residents of a nearby housing development.
- Farmland would be replaced by a large building, paved parking and truck areas.
- Construction was reported as lasting roughly nine to twelve months once it starts, but this timing comes from an undated article.
Where it stands
The county filing is a preliminary plan, and the township planning commission has recommended approval. The township supervisors usually vote on the plan next. If they approve it, the developer would then submit a final plan and apply for permits before building.
- Jul 2024 Latest county filing for the preliminary plan
Want to weigh in? The South Heidelberg Township supervisors decide the plan, and residents can comment at their public meetings. Check the township's posted agendas for dates.
Who's behind it
C&B Development, LLC · A Wyomissing, PA developer, according to press coverage. No official website was found, and its other projects were not confirmed.
Planning terms explained
- Preliminary plan
- An early-stage site plan that shows the building, driveways and stormwater. Local officials review it before the developer prepares the detailed final plan.
- Planning commission
- A volunteer township board that reviews development plans and recommends approval or denial to the elected supervisors.
- Board of supervisors
- The township's elected governing body, which makes the final decision on subdivision and land development plans.
- Land development
- A legal term for construction projects, such as a warehouse, that must be reviewed against township rules.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $53.2M
- ~4,093 roofing squares (assumes 1 story)
- ~1,023 tons of cooling (rule of thumb 400 sq ft/ton)