About this project

A preliminary plan in South Heidelberg Township to consolidate two lots and build a 23,838 sq ft auto collision center on about 4.5 acres, located at the end of Dutch Court.

Official description: 2-lot consolidation & new building w/ associated site improvements; Also refer to file #58-13379

Applicant
Berks Auto Collision Center, LLC; Dustin Sands
Owner
Berks Auto Collision Center, LLC
Developer
Berks Auto Collision Center, LLC
Engineer / designer
John W. Hoffert, PLS, Ltd.
Plan type
Preliminary
Land use
Commercial
Water
P
Sewer
P
Status
Reviewed

Filing history

  • 2025-09-08 · #58-9247m · Preliminary · 23,838 sq ft
  • 2025-09-05 · #58-9247l · Preliminary · 319,920 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

The developer proposes to combine two existing lots into one and build a 23,838-square-foot auto collision center, meaning a body and repair shop. The site is about 4.5 acres at the end of Dutch Court in South Heidelberg Township, Berks County. A Berks County review report lists about 3.44 acres as the area to be disturbed.

The filing is a preliminary plan. That is an early-to-middle stage of municipal review, where the layout, access, stormwater and utilities are checked before final approval.

No news coverage, township minutes or developer website was found for this project. The sources do not say what the land is used for now, or whether the township has acted on the plan.

What it could mean nearby

Where it stands

A preliminary plan was filed and appeared in a Berks County Planning Commission review report covering late August to mid-September 2025. Next the township planning commission and supervisors usually review it, and any needed engineering revisions follow before final plan approval. No township action was found.

Want to weigh in? The South Heidelberg Township planning commission and board of supervisors decide next. Residents can comment at their public meetings, and agendas are posted on the township website.

Who's behind it

Berks Auto Collision Center, LLC · The company is listed as applicant, developer and owner on the county filing. No other information about it was found.

Around the web

Planning terms explained
Preliminary plan
A detailed site layout submitted for review before the final plan is approved and recorded.
Lot consolidation
Merging two or more adjoining parcels into a single lot.
Terminus
The end of a road, here the end of Dutch Court.
Area to be developed
The portion of the site that will be built on or graded, as opposed to left undisturbed.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $4.8M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →