Berks County · Spring Township · #59-647a
Grings Hill Estates Section 5
Southeastern side of Grings Hill Road at the intersection with Hearthstone Lane., Spring Township, PA · 9 homes, single-family homes · 6.0 acres
About this project
A preliminary plan for nine new single-family lots, plus one residue lot, on about 6 acres along Grings Hill Road at Hearthstone Lane in Spring Township.
Official description: 1 Residue and 9 new residential lots
- Engineer / designer
- C2C Design Group; Attn: Elliot Leomporra
- Plan type
- Preliminary
- Land use
- Single-family
- Water
- P
- Sewer
- P
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
A preliminary plan has been filed with Berks County to divide about 6 acres into nine lots for single-family homes. It also leaves one extra "residue" lot. The site is on the southeastern side of Grings Hill Road, where it meets Hearthstone Lane in Spring Township. It sits next to the existing Grings Hill Estates neighborhood.
The county record doesn't say what is on the land now. No developer website, news coverage, meeting minutes or hearing notices turned up for this project. Nothing was found on opposition, approvals or who will live in the homes. The explanation here rests on the county filing alone.
What it could mean nearby
- Nine new households would add some traffic to Grings Hill Road and Hearthstone Lane. No traffic study was found.
- The homes would extend an existing residential area rather than start a new one.
- The plan creates nine home lots and one leftover lot. No details were found on open space, schools or utilities.
Where it stands
The latest county filing, dated 2024-03-19, is a preliminary plan. No approval or decision was found online. Next, the township planning commission and supervisors usually review the plan. A final plan follows after the developer addresses their comments.
- Mar 19, 2024 Latest county filing: preliminary plan for nine single-family lots and one residue lot
Want to weigh in? In Pennsylvania, the township planning commission and board of supervisors usually review subdivision plans at public meetings. Residents can comment there or contact the Spring Township office for agendas.
Who's behind it
C2C Design Group · C2C Design Group is the firm named on the county filing. It is likely the engineering or design firm for the plan, but the actual developer was not identified.
Planning terms explained
- Preliminary plan
- An early, detailed version of a subdivision layout that the township reviews before the final plan.
- Residue lot
- The leftover part of the original property that remains after the new lots are carved out.
- Subdivision
- Dividing one piece of land into several lots that can be sold or built on separately.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $5.0M
- ~288 roofing squares
- ~9 HVAC systems
- ~9 kitchens / 18+ bathrooms
- ~25,200 sq ft of finished living space
Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →