3 MW solar project, Canton Township

Grid connection point along State Route 14, Canton Township, PA · other

About this project

PIVOT proposes a 3 MW solar array (3.84 MW DC) on farmland in Canton Township, with about 6,625 panels up to 12 feet tall, a substation, switchyard, laydown yards and perimeter fencing. The project would connect to the grid along State Route 14, and the revised drawings were received October 7, 2026.

Issues raised: Engineer comments outstanding (response 3 received 10/14/26), Highway Occupancy Permit pending, NPDES and NBW pending, Recording fee not paid, Third extension requested to 2/9/27

Applicant
PIVOT
Engineer / designer
Keystone
Plan type
Conditional preliminary land development (solar); extension
Land use
other

Filing history

  • 2025-12-31 · #2026-007 · Conditional preliminary land development (solar); extension

County plan review office →

The full picture AI research

This project hasn't been researched yet. Request it and AI will look for news, township agendas and the builder's plans, then explain it in plain English.

Scope estimate for contractors

Too small to estimate.