Bradford County · Canton Township · #2026-007
3 MW solar project, Canton Township
Grid connection point along State Route 14, Canton Township, PA · other
About this project
PIVOT proposes a 3 MW solar array (3.84 MW DC) on farmland in Canton Township, with about 6,625 panels up to 12 feet tall, a substation, switchyard, laydown yards and perimeter fencing. The project would connect to the grid along State Route 14, and the revised drawings were received October 7, 2026.
Issues raised: Engineer comments outstanding (response 3 received 10/14/26), Highway Occupancy Permit pending, NPDES and NBW pending, Recording fee not paid, Third extension requested to 2/9/27
- Applicant
- PIVOT
- Engineer / designer
- Keystone
- Plan type
- Conditional preliminary land development (solar); extension
- Land use
- other
Filing history
- 2025-12-31 · #2026-007 · Conditional preliminary land development (solar); extension
The full picture AI research
This project hasn't been researched yet. Request it and AI will look for news, township agendas and the builder's plans, then explain it in plain English.
Scope estimate for contractors
Too small to estimate.