Bradford County · Sheshequin Township · #2026-015

3 MW solar facility, Sheshequin Township

Grid connection point along Sheshequin Road (SR 1043), Sheshequin Township, PA · other

About this project

PIVOT proposes a 3 MW solar facility (3.69 MW DC) on farmland in Sheshequin Township, with about 6,360 panels up to 12 feet tall, a collection substation, access road, stormwater basins and perimeter fencing. It would connect to the grid along Sheshequin Road.

Issues raised: Hunt Engineers' comments to satisfy, Decommissioning plan and bond pending, PUC interconnect pending, Highway Occupancy Permit, NPDES and sanitation pending, Third extension requested to 2/5/27

Applicant
PIVOT
Engineer / designer
Hunt Engineers
Plan type
Conditional preliminary land development (solar); extension
Land use
other

Filing history

  • 2026-02-10 · #2026-015 · Conditional preliminary land development (solar); extension

County plan review office →

The full picture AI research

This project hasn't been researched yet. Request it and AI will look for news, township agendas and the builder's plans, then explain it in plain English.

Scope estimate for contractors

Too small to estimate.