Bucks County · Hilltown Township · #10141-D

62,720 sq ft manufacturing building, Bethlehem Pike

West side of Bethlehem Pike (S.R. 408), about 575 ft south of Keystone Drive, Hilltown Township, PA · 62,720 sq ft non-residential, industrial · 7.7 acres

About this project

Fiddletree, LLC proposes a 62,720-square-foot manufacturing building on a 7.69-acre lot, replacing the existing structures on the site. Public water and sewer serve the site. Revisions reduce loading docks and add an access easement through the neighboring parcel.

County recommendation: No position

Issues raised: Earlier plan conditions must be met before approval, Waivers from road widening, curbs and sidewalks on Bethlehem Pike, Waivers from storm sewer pipe material, size and slope rules, Who maintains the access easement is unclear, Easement terms should be written into deeds

Applicant
Fiddletree, LLC
Engineer / designer
Hanover Engineering
Plan type
Revised final plan of land development
Land use
industrial
Zoning
HI Heavy Industrial

Filing history

  • 2026-01-05 · #10141-D · Revised final plan of land development · 62,720 sq ft

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

Fiddletree, LLC proposes a manufacturing building of about 62,720 square feet on a 7.69-acre lot on the west side of Bethlehem Pike (Route 408) in Hilltown Township. The existing structures on the site would be removed. Public water and sewer already serve the property.

Township planning commission minutes show the plan has changed over time. An April 2023 sketch plan showed a smaller building of about 53,760 square feet, with a trailer parking lot as an alternative. Commission members preferred the building. By December 2024 the number of truck loading docks had been cut from 13 to 5. Commissioners raised concerns about traffic, parking, outdoor storage, and wanted a wider landscaped buffer along Bethlehem Pike.

The latest county filing adds an access easement through the neighboring parcel. No news coverage, developer website or named end user was found.

What it could mean nearby

Where it stands

The plan is still under township review. Review has been going on since a 2023 sketch plan, and the latest county filing is dated January 2026. A township zoning hearing notice for June 2026 appears to name the applicant, but its contents could not be read, so the outcome is unknown. Next usually come planning commission and supervisor review of the land development plan, followed by any final approval.

Want to weigh in? Residents can comment at Hilltown Township public meetings of the planning commission, zoning hearing board and board of supervisors, whose agendas are posted at hilltown.org.

Who's behind it

Fiddletree, LLC

Around the web

Planning terms explained
Sketch plan
An early, informal drawing shown to the township for feedback before a formal application.
Land development plan
The formal site plan for a new building, covering parking, drainage, access and landscaping.
Zoning hearing board
A local board that decides requests for exceptions or variances from zoning rules.
Access easement
A legal right to cross a neighbor's land, such as for a driveway.
Buffer
A strip of trees or plantings that separates a development from the road or neighbors.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $8.2M