PlannedNearby

Bucks County · Bedminster Township · #11276-A

26-unit apartments on Elephant Road

West of the intersection of Twin Oaks Drive and Elephant Road, Bedminster Township, PA · 26 homes, 5,175 sq ft non-residential, apartments · 9.8 acres

About this project

Four multifamily buildings with 26 apartment units, two 1,320 sq ft garages, a 5,175 sq ft activity center and a playground on a 9.84-acre site. The site is now in agricultural use and would be served by public water and sewer.

County recommendation: Supports, with comments

Issues raised: 95 parking spaces proposed where 52 are required, 12 parking spaces located within the buffer, Dumpster location inconvenient for some residents, Sight distance at driveway near Elephant Road curve, Act 537 sewage planning module may be required

Applicant
The Piper Group
Engineer / designer
Horizon Engineering
Plan type
Sketch plan of land development
Land use
apartments
Zoning
R-3 Residential District

Filing history

  • 2026-06-04 · #11276-A · Sketch plan of land development · 26 lots/units · 5,175 sq ft

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

A developer has proposed four apartment buildings with 26 units on a 9.84-acre site in Bedminster Township, Bucks County. The site is west of Twin Oaks Drive and Elephant Road and is farmland today.

The plan also includes a 5,175 sq ft activity center, a playground and two 1,320 sq ft garages. County records say the project would use public water and sewer.

No news coverage, meeting minutes or developer webpage about this project was found online. Whether it faces opposition, has approvals, or who would live there is not known from public sources.

What it could mean nearby

Where it stands

A filing was made with the county on 2026-06-04, which suggests the plan is in early municipal and county review. Next steps usually include township planning commission and supervisor review, plus sewer and stormwater approvals. No decision was found.

Want to weigh in? Bedminster Township's planning commission and board of supervisors usually review land development plans at public meetings, and residents can comment there. Check the township's posted agendas for dates.

Who's behind it

The Piper Group · The Piper Group is named on the county filing. Horizon Engineering is also listed, and no further information on either firm was found.

Planning terms explained
Land development plan
A detailed site plan showing buildings, parking, utilities and drainage that a township reviews before construction.
Multifamily
A building type that holds several separate homes, such as apartments.
Public water and sewer
Connections to community water and sewage systems instead of private wells and septic tanks.
Board of supervisors
The elected body that governs a Pennsylvania township and typically approves or denies development plans.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $7.3M