PlannedNearby

Bucks County · Milford Township · #12512-C

96 age-restricted townhomes, Milford Village Section 6

South side of Old Bethlehem Pike, about 1,000 feet southeast of Mill Hill Road, Milford Township, PA · 96 homes, 30,000 sq ft non-residential, mixed use · 49.5 acres

About this project

Combines three parcels into a 49.5-acre site for 96 age-restricted townhouses, a 5,000 sq ft clubhouse with an outdoor pool, and a new two-story 25,000 sq ft wellness center. The existing medical office building would be renovated. The site is now medical office and vacant land.

County recommendation: No position

Issues raised: Revised master plan and conditional uses must be approved first, Parking oversupply for clubhouse and townhomes, 464-foot cul-de-sac exceeds 400-foot maximum, Parking space too close to driveway access, Sewage facilities planning module required

Applicant
SKAOS, LLC
Engineer / designer
Pany & Lentz Engineering Company
Plan type
Sketch plan of land development
Land use
mixed-use
Zoning
Arterial Mixed Use (AMU) District

Filing history

  • 2026-02-17 · #12512-C · Sketch plan of land development · 96 lots/units · 30,000 sq ft

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

The developer proposes a 49.5-acre age-restricted community of 96 townhomes. It would also have a 5,000 sq ft clubhouse with an outdoor pool and a new two-story wellness center of about 25,000 sq ft. The existing medical office building would be renovated. Three parcels would be combined. The site is now medical office space and vacant land.

Township records show earlier plans for this campus included a larger wellness center and a memory care facility. The applicant later revised the plan, added about 10 acres, and shifted toward townhomes and patio homes. The township listings describe a smaller wellness center. A township agenda lists the new plan as a sketch plan, which is an early, informal review.

No news coverage or organized opposition was found. The records read by search summary only, so details are unconfirmed.

What it could mean nearby

Where it stands

The project appears to be at an early sketch-plan stage with the township. Formal land-development plans usually go next to the planning commission and then to the township supervisors for approval.

Want to weigh in? The Milford Township planning commission and board of supervisors review the plans at public meetings; residents can comment there, and agendas are posted on the township website.

Who's behind it

SKAOS, LLC · SKAOS, LLC is the applicant named on the county filing, with Pany & Lentz Engineering Company as the engineering firm; no company website was found.

Around the web

Planning terms explained
Sketch plan
An early, informal plan shown to the township for feedback before formal plans are filed.
Age-restricted
Housing limited to older residents, typically 55 and over.
Land development
The formal township review of a site plan covering buildings, roads, drainage and utilities.
Cul-de-sac
A dead-end street with a circular turnaround at the end.
Use by right
A use that zoning allows without special approval, as long as the rules are met.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $61.6M