Proposes a 10,000 sq ft contractor services shop and a 4,000 sq ft accessory storage building on the vacant 16.42-acre lot. About 2.85 acres would be outside storage with 35 block storage bins, and a future 1.14-acre storage yard is also shown. The site would use on-lot water and sewer.

County recommendation: No position

Issues raised: Requested waivers from curbs, sidewalks, and PennDOT cartway widening, Removal of 5.6 acres of woodlands; replacement and afforestation plan needed, No tree protection fencing shown for preserved woodlands, Pedestrian connections between buildings and parking not shown

Applicant
TNG&D, LLC
Engineer / designer
MSR Engineering
Plan type
Revised preliminary land development
Land use
other
Zoning
PC-2 Planned Commercial-2

Filing history

  • 2026-03-20 · #13051 · Revised preliminary land development · 14,000 sq ft

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

The county filing describes a contractor services shop of about 10,000 square feet. A 4,000-square-foot storage building would sit next to it. Both would go on a vacant lot of about 16.4 acres on the southwest side of Old Bethlehem Pike, between Weikel Road and Forrest Road in West Rockhill Township.

About 2.85 acres of the lot would be outdoor storage, with 35 block bins for bulk materials. The plans also show a possible 1.14-acre storage yard for later. The site would use its own well and septic system, not public water and sewer.

No developer website, news story, meeting agenda or approval record clearly about this project was found. A March 2025 local news recap mentioned a similar-sized excavation shop on Bethlehem Pike near Forrest Road. It did not name the applicant or mention Weikel Road, so it is not treated as confirmed to be this project.

What it could mean nearby

Where it stands

A plan was filed with the county in March 2026, and no township approval was found online. Township review usually comes next, covering the planning commission and the supervisors. They typically look at zoning compliance, stormwater, and well and septic approvals.

Want to weigh in? The West Rockhill Township Planning Commission and Board of Supervisors would likely review the plan at public meetings. Residents can usually comment there, and the township office can confirm agendas.

Who's behind it

TNG&D, LLC · The filing lists this company with MSR Engineering. No official website or information on its other projects was found.

Planning terms explained
Accessory building
A secondary building that supports the main use of a property, such as storage for a shop.
Outside storage
Materials or equipment kept in the open air on a site, not inside a building.
On-lot water and sewer
A private well and septic system on the property, used in place of public water and sewer lines.
Land development plan
A detailed site plan a township reviews for buildings, parking, drainage and access before construction is allowed.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $2.8M