Bucks County · Quakertown Borough · #35-26-SD1

Elementary school replacement on School Lane

Block bounded by School Lane, South 6th Street, Park Avenue and South 7th Street, Quakertown Borough, PA · 60,241 sq ft non-residential, school · 5.3 acres

About this project

The plan demolishes the existing elementary school on a 5.33-acre site and builds a new 60,241 sq ft elementary school, about 35,180 sq ft larger than the old building. It also changes parking, vehicle circulation and stormwater management. Public water and sewer serve the site.

County recommendation: Supports, with comments

Issues raised: Conditional use approval required before plan approval, Removal of at least seven mature trees, including street trees, Pick-up/drop-off traffic and bus stacking on School Lane and 6th Street, Speeding and pedestrian safety improvements on 7th Street, Stormwater peak flow and calculation accuracy

Applicant
Quakertown Community School District
Engineer / designer
Terraform Engineering, LLC
Plan type
Preliminary land development
Land use
school
Zoning
HR High Density Residential

Filing history

  • 2026-01-12 · #35-26-SD1 · Preliminary land development · 60,241 sq ft

County review packet (meeting materials) →

Map pin is approximate.

The full picture AI research · Nov 1, 2026

Quakertown Community School District plans to tear down the existing Quakertown Elementary School and build a new one on the same block. The block is bounded by School Lane, South 6th Street, Park Avenue and South 7th Street. The site is about 5.33 acres.

The new building would be about 60,241 square feet, roughly 35,000 square feet larger than the old one. The plan also changes parking, how cars move around the site, and stormwater handling. Public water and sewer already serve the site.

Local news reported that the school board approved a tentative design in August 2025. The cost was put at over $63 million. The old 1928 building would come down after the school year, and students would use temporary modular buildings at the district's Sixth Grade Center for at least 2.5 years.

What it could mean nearby

Where it stands

The county shows a plan filing on 2026-01-12, and the district has already approved a design and a temporary relocation. A third-party summary, which was not verified, says a school-district hearing was held in April 2026. Next steps usually are borough review of the land development plan, then bidding and construction. Bid listings run into 2026.

Want to weigh in? The Quakertown Community School District board decides on the project itself, and Quakertown Borough reviews the land development plan, so residents can comment at public meetings of either body.

Who's behind it

Quakertown Community School District · The public school district serving Quakertown and surrounding communities, which owns and operates the area's public schools; Terraform Engineering, LLC is the engineer on the filing.

Around the web

Planning terms explained
Land development plan
A detailed site plan the borough reviews, covering buildings, parking, drainage and utilities.
Stormwater management
Features that collect and slow rain runoff so it does not flood neighboring properties.
Vehicle circulation
How cars, buses and delivery vehicles enter, move through and leave a site.
Modular buildings
Prefabricated temporary classrooms used while a school is rebuilt.

Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $21.1M