Butler County · Middlesex Township · #26117
Amber Grove land development, 89 townhomes
Middlesex Township, PA · 89 homes, townhomes
About this project
Land development for 89 townhomes in Middlesex Township, part of the Amber Grove project. The county notes that NPDES approval has not been submitted.
County recommendation: Supports, with comments
Issues raised: NPDES approval not submitted
- Plan type
- Land development
- Land use
- townhomes
The full picture AI research · Nov 1, 2026
Amber Grove is a plan for 89 townhomes on about 19.8 acres along Route 228 in Middlesex Township, near the Weatherburn Drive intersection. Homes would be served by a private looping internal road network. The site was previously used as a staging area during the Route 228 widening.
The plan has changed over time. An earlier version had 52 townhomes and two commercial buildings. After a township ordinance change and a dispute over road connections with the neighboring Sienna Village community, the developer dropped the commercial space and moved to an all-residential plan. Lawsuits tied to the dispute were reportedly dropped after the revised plan was submitted.
Local coverage reports the township planning commission and supervisors both gave final land development approval in mid-2026. One article gives a different unit count (about 80), but the county record and the Butler Eagle say 89. The county record notes that state stormwater permit (NPDES) approval had not been submitted as of its May 2026 filing.
What it could mean nearby
- Removing the retail space is estimated by the township to cut roughly 700 weekly evening peak-hour trips compared with the original plan.
- No road will connect Amber Grove to Sienna Village, so residents rely on Weatherburn Drive and Route 228.
- Early grading and a stormwater basin were reported under way, so construction activity may be visible nearby.
- 89 new households would add to local housing; no school or jobs figures were found.
Where it stands
Local news reports final land development approval from the township planning commission (June 2026) and the supervisors (July 2026). Next usually come the remaining state and county permits, such as stormwater (NPDES) approval, followed by construction and building permits.
- Jul 15, 2026 Township supervisors reportedly granted final land development approval
- Jun 24, 2026 Township planning commission recommended/granted final approval
- May 20, 2026 Latest county planning filing; NPDES approval noted as not yet submitted
- Oct 2025 Supervisors granted conditional use approval
- Sep 2022 Township amended its Route 228 overlay ordinance on street connections
- Jun 2022 First application filed for the earlier mixed-use plan
Want to weigh in? Local approvals appear complete, so remaining comment opportunities are limited; residents can follow Middlesex Township supervisors' public meetings for any further actions.
Who's behind it
Penn Acres, LLC · A limited liability company named in local reporting as the Amber Grove developer; no company website or other projects were found.
Around the web
- Middlesex Township grants final approval to Amber Grove projectButler Eagle · Jul 16, 2026Reports supervisors' final approval of 89 townhomes on 19.8 acres along Route 228.
- Middlesex Township planning commission grants final approval to Amber Grove townhomesButler Eagle · Jun 24, 2026Reports the planning commission's final approval of the townhome plan.
- Middlesex Township grants conditional use approval to Amber Grove townhome developmentButler Eagle · Oct 16, 2025Reports conditional use approval for the project.
- Amber Grove: How Two Developments, a Changed Ordinance, and a Legal Battle Shaped One of Middlesex Township's Most Complex Land-Use Decisions228 TimesExplains the road-connection dispute, ordinance change, lawsuits and the shift from mixed-use to all-residential.
Planning terms explained
- Land development
- The formal review of a site plan covering buildings, roads, utilities and stormwater.
- Conditional use
- A use allowed in a zoning district only after a public hearing and approval by the supervisors.
- NPDES
- A state stormwater permit required for construction that disturbs larger areas of land.
- Overlay ordinance
- Extra local rules layered on top of normal zoning for a specific corridor, here Route 228.
- Right-in, right-out
- A driveway where vehicles can only turn right when entering or leaving the road.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $32.9M
- ~1,246 roofing squares
- ~89 HVAC systems
- ~89 kitchens / 178+ bathrooms
- ~178,000 sq ft of finished living space