# Golden Oaks Village land development, Kidder Twp

Kidder Township, PA · other

In short: **Golden Oaks Village land development, Kidder Twp** is a development project in Kidder Township, Carbon County, PA. As of November 24, 2026, it is in review. Latest record: County review of NPDES Chapter 102 permit for land development reviewed at a meeting of the county planning commission (February 18, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · County review of NPDES Chapter 102 permit for land development reviewed at a meeting of the county planning commission · Feb 18, 2025 · [source](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

The county is reviewing the PA DEP NPDES Chapter 102 permit application for the Golden Oaks Village land development in Kidder Township. The agenda does not give the size, layout, or current use of the site.

- **Plan type:** County review of NPDES Chapter 102 permit for land development
- **Land use:** other

## Project history

- **2025-02-18** · #2025-02-golden-oaks-village-land-development-kid · County review of NPDES Chapter 102 permit for land development

[County plan review office →](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php)

Map pin is approximate.

## The full picture AI research · Nov 14, 2026

Golden Oaks Village is an existing residential subdivision in Kidder Township, Carbon County, that has been under development for years. In February 2025 the county planning commission reviewed a state stormwater permit application (called an NPDES Chapter 102 permit) for further land development there. The county agenda does not give the size, layout or current use of the site.

The project has a troubled history. A 2010 news report said the original developer ran short of money. Planners approved a scaled-back plan to finish roads (Read Oak, White Oak and part of Keystone Road) and clean up stormwater basins, and the remaining portions were deferred. A current real-estate listing offers about 45 single-family building lots on a 10-acre parcel in the subdivision. The listing mentions an HOA with a clubhouse. The search summary did not show whether new construction is under way.

### What it could mean nearby

- Finishing the roads and stormwater basins, as planned back in 2010, would improve access and drainage for lots already in the subdivision.
- A listing for about 45 building lots suggests more single-family homes could be added, though no approved plan for them was found.
- The state stormwater permit review is meant to control runoff and erosion during construction.

### Where it stands

County records show the state stormwater permit application was under review at the planning commission on 2025-02-18. No later permit, approval or construction notice was found, so the county's review stage still stands. Next would normally be the state permit decision and then township approvals, if any remain, before site work or building.

- **Feb 18, 2025** County planning commission reviewed the NPDES Chapter 102 permit application for the land development
- **Aug 12, 2010** Kidder planners approved a scaled-back plan to finish roads and stormwater work; it still needed the township supervisors' approval

### Around the web

- [Carbon County Planning Commission](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php) — Carbon County, PA · Feb 18, 2025Shows the county's review of the NPDES permit for the project.
- [Kidder planners pass development re-phasing plan](https://www.tnonline.com/?p=74230) — Times News · Aug 12, 2010Reports that the developer lacked funds, that planners approved a scaled-back road and stormwater completion plan, and that some portions were deferred.
- [Kidder Township building lots listing](https://www.remax.com/pa/kidder-township-n/home-details/pa-940-kidder-township-n-pa-18661/6572543568327700344/M00000534/726825) — RE/MAXA search summary of this listing describes about 45 single-family building lots on 10 acres in the existing Golden Oaks Village subdivision. The page itself could not be read.

Planning terms explained

- **NPDES Chapter 102 permit:** A Pennsylvania permit required to control stormwater runoff and soil erosion from construction sites that disturb larger areas of land.
- **Land development:** A formal plan to build on or subdivide land, reviewed by the township and county for layout, roads and drainage.
- **Re-phasing:** Splitting a project into stages and postponing some stages until later, as was done for this site in 2010.
- **Construction bond:** Money a developer posts so the township can finish required roads and utilities if the developer does not.
- **Stormwater retention basin:** A built depression that holds rainwater runoff and releases it slowly to reduce flooding and erosion.

Researched by AI from public sources on Nov 14, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Kidder Township supervisors and planning body handle local approvals, and PA DEP decides the stormwater permit; residents can raise concerns at township meetings, which the township holds monthly.

In Pennsylvania, Kidder Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Kidder Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Kidder Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Kidder Township's meeting agendas →](https://www.google.com/search?q=Kidder+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Buffer strip tract lot consolidation, Kidder Township](https://plannednearby.com/x/carbon-4045) — same area · lot line change · Kidder Township · filed 2026-03-17
- [Golden Oaks Village land development (Kidder)](https://plannednearby.com/x/carbon-2024-08-golden-oaks-village-land-development-kid) — same area · other · Kidder Township · filed 2024-08-20
- [Mora Solar Park land development, Kidder Township](https://plannednearby.com/x/carbon-2025-10-mora-solar-park-land-development-kidder) — same area · recreation · Kidder Township · filed 2025-10-21
- [Lot adjustment in Kidder Township](https://plannednearby.com/x/carbon-3987) — same area · lot line change · Kidder Township · filed 2025-03-18
- [Lot consolidation, Kidder Township](https://plannednearby.com/x/carbon-4002) — same area · lot line change · Kidder Township · filed 2025-06-17
- [Lot combination review, Kidder Township](https://plannednearby.com/x/carbon-lot-combination-review-kidder-township-02126f) — same area · lot line change · Kidder Township · filed 2024-06-18

[See everything nearby on a map →](https://plannednearby.com/near#41.04707,-75.66168,Kidder%20Township)

---

Source page: https://plannednearby.com/x/carbon-2025-02-golden-oaks-village-land-development-kid

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.