[Carbon County](https://plannednearby.com/c/carbon-pa/) · [Franklin Township](https://plannednearby.com/c/carbon-pa/franklin-township) · #2025-08-solar-park-land-development-in-franklin · [Solar farms tracker](https://plannednearby.com/topics/solar-farms/)

# Solar park land development in Franklin Twp

Franklin Township, PA · recreation

In short: **Solar park land development in Franklin Twp** is a recreation project in Franklin Township, Carbon County, PA. As of November 24, 2026, it is in review. Latest record: Land development plan (DEP NPDES Chapter 102 permit county review) reviewed at a meeting of the county planning commission (August 19, 2025). What usually happens next: a planning commission recommendation, then a vote by the town's governing body.

Stage: In review · Land development plan (DEP NPDES Chapter 102 permit county review) reviewed at a meeting of the county planning commission · Aug 19, 2025 · [source](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php)

Usually next: a planning commission recommendation, then a vote by the town's governing body.

## About this project

Agenda lists a land development plan for a solar park in Franklin Township, reviewed as part of a PA DEP NPDES Chapter 102 permit. The agenda gives no capacity, site area, or existing conditions.

- **Plan type:** Land development plan (DEP NPDES Chapter 102 permit county review)
- **Land use:** other

## Project history

- **2025-08-19** · #2025-08-solar-park-land-development-in-franklin · Land development plan (DEP NPDES Chapter 102 permit county review)

[County plan review office →](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php)

Map pin is approximate.

## The full picture AI research · Nov 7, 2026

A land development plan for a solar park in Franklin Township was listed on a Carbon County agenda in August 2025. The county was reviewing it as part of a state stormwater and erosion permit. The agenda gave no size, output or description of the site.

The only solar park with a plan on record in the township is the Bollinger Solar Farm at 208 Memorial Drive, on former industrial land. It would have about 8,000 panels on roughly 9 acres. Earlier county comments described a larger 37-acre site. Township supervisors gave the plan conditional approval in August 2024. This page does not confirm that the 2025 county filing is for the Memorial Drive site.

A separate solar proposal for Renner Road is stuck in a zoning dispute. The township also adopted a resolution in October 2024 aimed at preventing future solar farms. No sign of construction was found.

### What it could mean nearby

- The Memorial Drive site is former industrial land zoned industrial, so it would not take up farmland.
- County planners raised concerns about steep slopes and emergency-vehicle access, and supervisors required clear sight lines at intersections.
- A solar park of this kind typically brings few permanent jobs and little traffic once built.

### Where it stands

The county review tied to the state stormwater permit was filed 2025-08-19. For the Memorial Drive plan, the township granted conditional approval in 2024, and the use was not allowed in the industrial zone without further zoning approvals. Typically the permit, any remaining zoning approvals and the conditions of approval must be met before construction starts. Note: County comments in 2024 described a 37-acre site at 208 Memorial Drive, while later township coverage describes about 9 acres, and it is unconfirmed whether the 2025 county filing is this project.

- **Aug 19, 2025** Land development plan with a state stormwater permit listed for county review
- **Oct 2024** Township supervisors adopted a resolution aimed at preventing future solar farms
- **Aug 2024** Supervisors gave conditional land development approval to the Bollinger Solar Farm plan at 208 Memorial Drive
- **May 2024** County planning commission recommended rejecting the plan and sent comments to the township

### Who's behind it

Bollinger Solar LLC (site owner: Lehighton Site LLC) · Bollinger Solar is a solar developer that has also proposed projects in Mahoning and Towamensing townships; it is named in coverage of the Memorial Drive plan, though it is not confirmed as the applicant in the 2025 county filing.

### Around the web

- [Franklin approves land development plan for solar farm](https://www.tnonline.com/?p=264178) — Times News · Aug 26, 2024Supervisors unanimously gave conditional approval to the Bollinger Solar Farm plan at 208 Memorial Drive, with conditions including zoning approvals.
- [Solar fields on hold](https://www.tnonline.com/?p=260819) — Times News · May 2, 2024The county planning commission recommended rejecting the plan and cited slopes, access and missing studies.
- [Year-end review of solar proposals and zoning](https://www.tnonline.com/?p=268069) — Times News · Dec 31, 2024Summarizes the 2024 approval, the October 2024 resolution against future solar farms, and the pending Renner Road challenge.
- [Franklin approves waivers for solar farm](https://tnonline.com/?p=263179) — Times News · Aug 2024Supervisors granted waivers for the Memorial Drive project.
- [Towamensing zoning board denies Bollinger solar request](https://www.tnonline.com/?p=276203) — Times News · Sep 30, 2025A 2025 article that mentions the Franklin Township project only as background and shows no later progress.

Planning terms explained

- **Land development plan:** A detailed site plan showing what will be built, where, and how it is served by roads and drainage.
- **NPDES Chapter 102 permit:** A state permit that requires erosion and stormwater controls for construction that disturbs land.
- **Waiver:** Permission to skip or modify a specific rule in the township's development ordinance.
- **Conditional approval:** Approval that depends on the developer meeting listed requirements before the plan is final.
- **Curative amendment:** A landowner's legal challenge claiming a township's zoning rules unfairly exclude a use.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The Franklin Township supervisors decide the plan, and residents can comment at their public meetings; the county planning commission provides advisory review.

In Pennsylvania, Franklin Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Franklin Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Franklin Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Franklin Township's meeting agendas →](https://www.google.com/search?q=Franklin+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Minor subdivision with Lehighton Water Authority, Franklin Twp.](https://plannednearby.com/x/carbon-2026-11-minor-subdivision-with-lehighton-water-a) — same area · lot line change · Franklin Township · filed 2026-11-17
- [Minor subdivision/lot combination, Franklin Twp](https://plannednearby.com/x/carbon-4052) — same area · lot line change · Franklin Township · filed 2026-04-21
- [Minor subdivision, Franklin Township](https://plannednearby.com/x/carbon-4042) — same area · subdivision (use not stated) · Franklin Township · filed 2026-02-17
- [Solar land development in Franklin Township](https://plannednearby.com/x/carbon-3930) — same area · other · Franklin Township · filed 2024-04-16
- [Bollinger Solar Park land development, Franklin Twp](https://plannednearby.com/x/carbon-2025-10-bollinger-solar-park-land-development-fr) — same area · recreation · Franklin Township · filed 2025-10-21
- [Minor subdivision / lot line adjustment, Franklin Twp](https://plannednearby.com/x/carbon-3961) — same area · lot line change · Franklin Township · filed 2024-10-15

[See everything nearby on a map →](https://plannednearby.com/near#40.84904,-75.66852,Franklin%20Township)

---

Source page: https://plannednearby.com/x/carbon-2025-08-solar-park-land-development-in-franklin

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
