Carbon County · Lower Towamensing Township · #2025-08-tractor-supply-land-development-in-lower
Tractor Supply land development in Lower Towamensing
Lower Towamensing Township, PA · retail & commercial
In short: Tractor Supply land development in Lower Towamensing is a retail and commercial development in Lower Towamensing Township, Carbon County, PA. As of November 24, 2026, it is approved according to web research. Latest record: A Times News article from May 2026 reports the township supervisors granted conditional preliminary approval of the land development plan and approved the… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Named in the records: Tractor Supply
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
Agenda lists a land development plan for a Tractor Supply store in Lower Towamensing Township, reviewed as part of a PA DEP NPDES Chapter 102 permit. The agenda gives no building size, site area, or existing conditions.
- Plan type
- Land development plan (DEP NPDES Chapter 102 permit county review)
- Land use
- retail
Project history
- 2025-08-19 · #2025-08-tractor-supply-land-development-in-lower · Land development plan (DEP NPDES Chapter 102 permit county review)
Map pin is approximate.
The full picture AI research · Nov 7, 2026
A Tractor Supply store is proposed at 780 Little Gap Road, just outside Palmerton in Lower Towamensing Township. A planning commission document says the new store's address will be 800 Little Gap Road. The developer plans to subdivide the property, build the store with a paved lot, and add a concrete garden center. The county agenda gives no building size or acreage, and none of the sources found give them either. The site is zoned industrial, and one news report mentions an existing building at the address.
The zoning hearing board approved variances in April 2025. These covered retail use in an industrial zone, higher lot coverage, signs and display space. They also allowed live animals to be sold, as long as the animals stay indoors before sale. In May 2026 the township supervisors granted conditional preliminary approval of the land development plan and approved the subdivision plan. A resident raised stormwater runoff concerns at that meeting. No evidence of construction or an opening was found.
What it could mean nearby
- Stormwater: a resident raised runoff worries. The township says its engineer and the developer's engineer will review drainage.
- Traffic and access: a planning commission item refers to PennDOT access, and the site fronts a state road with a future right-of-way reserved.
- Site coverage: about 55% of the lot would be paved or built on, against a 35% limit in the ordinance, which is why variances were needed.
- Retail: it would add a farm and pet supply store in an industrial-zoned area near Palmerton.
Where it stands
The township supervisors granted conditional preliminary approval of the land development plan in May 2026, which is later than the county review filed in August 2025. The developer still has to meet the approval conditions and obtain the state stormwater permit and other permits before building. No source shows work under way.
- May 2026 Supervisors grant conditional preliminary land development approval and approve the subdivision plan
- Feb 2026 Supervisors give conditional subdivision approval and a land development time extension
- Dec 2025 Supervisors approve a municipal land use letter for the building, paving and garden center
- Aug 19, 2025 Land development plan filed for county review with the DEP NPDES Chapter 102 permit
- Apr 2025 Zoning hearing board approves variances
- Mar 2025 Zoning hearing board hearing on the variance request
Who's behind it
MSP Development · The applicant named in local news coverage of the Tractor Supply proposal, with Widmer Engineering as its engineer. No other details about the company were found.
Around the web
- Lower Tow. store gets conditional approvalTimes News · May 11, 2026The supervisors granted conditional preliminary land development approval and approved the subdivision; a resident raised stormwater concerns.
- Tractor Supply gets conditional approvalTimes News · Feb 4, 2026The supervisors gave conditional subdivision approval and a land development time extension.
- L. Towamensing approves land use letter for Tractor SupplyTimes News · Dec 12, 2025The supervisors approved a municipal land use letter covering the building, paving and garden center.
- L. Towamensing OKs variance for Tractor SupplyTimes News · Apr 16, 2025The zoning hearing board approved variances for the store.
- L. Towamensing board hears Tractor Supply plansTimes News · Mar 19, 2025The article describes the industrial zoning, the lot coverage and sign variances sought, the developer and its engineer.
- Tractor Supply applies for L. Towamensing permitTimes News · Mar 6, 2025The article reports the developer's initial application to the township.
Planning terms explained
- Land development plan
- A detailed site plan for new buildings, parking and utilities that a township must approve.
- Conditional approval
- Approval that depends on the developer meeting listed requirements before the plan is final.
- Variance
- Permission from the zoning hearing board to depart from a zoning rule, such as the allowed use or lot coverage.
- NPDES Chapter 102 permit
- A state stormwater permit for construction sites that disturb larger areas of land, aimed at controlling erosion and runoff.
- Impervious coverage
- The share of a lot covered by buildings and pavement that water cannot soak through.
Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: The Lower Towamensing Township supervisors decide the remaining approvals, and residents can comment at their public meetings.
In Pennsylvania, Lower Towamensing Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Lower Towamensing Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Lower Towamensing Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Lower Towamensing Township's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- High school additions, Palmerton Area SDsame area · school · Lower Towamensing Township · filed 2025-12-17
- Minor subdivision in Lower Towamensing Townshipsame area · subdivision (use not stated) · Lower Towamensing Township · filed 2025-12-16
- Palmerton Tractor Supply, Lower Towamensing Townshipsame area · retail & commercial · Lower Towamensing Township · filed 2025-10-21
- Lot line consolidation, Towamensing Townshipsame area · lot line change · Lower Towamensing Township · filed 2025-02-18
- Mauch Chunk Wash & Storage land developmentsame area · warehouse & storage · Palmerton Borough · filed 2024-09-17
- Minor subdivision/lot line revision, Lower Towamensingsame area · lot line change · Lower Towamensing Township · filed 2024-01-16