[Carbon County](https://plannednearby.com/c/carbon-pa/) · [Kidder Township](https://plannednearby.com/c/carbon-pa/kidder-township) · #3963

# Lot combination in Kidder Township

Kidder Township, PA · lot line change

In short: **Lot combination in Kidder Township** is a lot line change in Kidder Township, Carbon County, PA. As of November 24, 2026, it is approved according to web research. Latest record: A Times News roundup published 2024-11-29 reports conditional plan approval for combining two lots into one 0.650-acre lot at Chipmunk Trail and Taratina Drive… What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · A Times News roundup published 2024-11-29 reports conditional plan approval for combining two lots into one 0.650-acre lot at Chipmunk Trail and Taratina Drive in Kidder Township, but the article does not give the exact… · web research checked Nov 13, 2026 · [source](https://www.tnonline.com/20241129/carbon-county-planning-commission-19/) AI research

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

A lot combination in Kidder Township, reviewed at preliminary/final stage. The agenda does not give lot sizes, acreage, or current site conditions.

- **Plan type:** Preliminary/Final lot combination
- **Land use:** lot-line-change

## Project history

- **2024-11-19** · #3963 · Preliminary/Final lot combination

[County plan review office →](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php)

Map pin is approximate.

## The full picture AI research · Nov 13, 2026

This is a lot combination in Kidder Township, Carbon County. It merges two neighboring parcels into one. No buildings, homes or business uses are proposed in the records found.

A news report on the county planning commission's late-November 2024 meeting lists one Kidder Township item that appears to match. It combines two lots into one lot of about 0.65 acres. The lots are at Chipmunk Trail and Taratina Drive in the Pocono Mountain Lake area. The county's own agenda and minutes for November 19, 2024 are scanned images that could not be read. The match therefore rests on the news report alone: it is the only Kidder Township item in that article, but it does not give the meeting date.

The commission gave conditional plan approval, which means the plan can go ahead if listed conditions are met. Nothing was found on current site conditions or on any construction.

### What it could mean nearby

- Merging two small lots into one normally adds no homes, so little new traffic, school or utility demand is expected.
- A combined lot generally means one building site instead of two, which may slightly reduce future density in the subdivision.

### Where it stands

The county planning commission reviewed the plan at its November 2024 meeting and, per a news report, gave conditional plan approval. Next, the township would give its own sign-off and the merged lot deed would be recorded. No permits or construction were found.

- **Nov 29, 2024** Local newspaper reports conditional plan approval for the Kidder Township lot combination at the county planning commission's late-November meeting
- **Nov 19, 2024** County planning commission reviews the preliminary/final lot combination

### Around the web

- [Carbon County Planning Commission](https://www.tnonline.com/20241129/carbon-county-planning-commission-19/) — Times News (tnonline.com) · Nov 29, 2024Reports conditional plan approval for combining two lots into one 0.650-acre lot at Chipmunk Trail and Taratina Drive, Kidder Township.
- [Planning Commission](https://www.carboncountypa.gov/government/boards_authorities___commissions_/planning_commission.php) — Carbon County, PALinks the November 19, 2024 agenda, minutes and video, but the agenda and minutes PDFs are unreadable scans.

Planning terms explained

- **Lot combination:** Two or more neighboring parcels are legally merged into one, with no new building lots created.
- **Lot line change:** A boundary between parcels is moved or removed, with no new lots added.
- **Preliminary/final plan:** A single review that covers both the first and last plan stages, used for simple changes.
- **Conditional plan approval:** Approval that depends on the applicant meeting listed requirements before the plan is finalized.

Researched by AI from public sources on Nov 13, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The county planning commission only advises. The Kidder Township planning commission and supervisors make the binding decision, and residents can comment at their public meetings.

In Pennsylvania, Kidder Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Kidder Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Kidder Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Kidder Township's meeting agendas →](https://www.google.com/search?q=Kidder+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Not enough detail to estimate.

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [Camptel Poconos lot consolidation in Kidder Township](https://plannednearby.com/x/carbon-4067) — same area · lot line change · Kidder Township · filed 2026-07-21
- [Golden Oaks Village land development, Kidder Twp](https://plannednearby.com/x/carbon-2024-12-golden-oaks-village-land-development-kid) — same area · other · Kidder Township · filed 2024-12-17
- [Lot consolidation, Kidder Township](https://plannednearby.com/x/carbon-4003) — same area · lot line change · Kidder Township · filed 2025-07-15
- [Camptel Poconos lot consolidation, Kidder Twp](https://plannednearby.com/x/carbon-camptel-poconos-lot-consolidation-kidder-a0a934) — same area · lot line change · Kidder Township · filed 2026-07-21
- [Lot improvement plan, Kidder Township](https://plannednearby.com/x/carbon-lot-improvement-plan-kidder-township-c6f937) — same area · other · Kidder Township · filed 2026-01-20
- [Lot consolidation in Kidder Township](https://plannednearby.com/x/carbon-4064) — same area · lot line change · Kidder Township · filed 2026-07-21

[See everything nearby on a map →](https://plannednearby.com/near#41.05879,-75.67925,Kidder%20Township)

---

Source page: https://plannednearby.com/x/carbon-3963

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.
