Eagle Hospitality complete revision, Franklin Twp

Franklin Township, PA · institutional

In short: Eagle Hospitality complete revision, Franklin Twp is an institutional project in Franklin Township, Carbon County, PA. As of November 24, 2026, it is under construction according to web research. Latest record: The Times News reported a groundbreaking at the site in June 2026. The developer said construction should start soon and take about 14 months. What usually happens next: completion and occupancy.

Under construction The Times News reported a groundbreaking at the site in June 2026. The developer said construction should start soon and take about 14 months. · web research checked Nov 7, 2026 · source AI research
  1. Proposed
  2. In reviewSep 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: completion and occupancy.

About this project

A complete revision of a minor subdivision and land development plan for the Eagle Hospitality project in Franklin Township. The agenda gives no details on size, site layout, or current use of the land.

Applicant
Interchange Investment Group, LLC
Plan type
Minor subdivision/land development, complete revision (preliminary/final)
Land use
other

Project history

  • 2025-09-16 · #3972R1 · Minor subdivision/land development, complete revision (preliminary/final)

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 7, 2026

The project is a Marriott TownePlace Suites extended-stay hotel at 1055 Interchange Road in Franklin Township. The road is near the Pennsylvania Turnpike exit. The site is the former Jimmy's Gym property, part of a roughly 9-acre parcel. Local news reports 97 or 98 rooms, depending on the article. Reports also mention a pool and kitchenettes in the rooms. The hotel would sit on about 6.3 acres.

The county filing from September 2025 was a complete revision of the subdivision and land development plan. Township supervisors then gave conditional approval in December 2025. In April 2026 the developer said it had met the conditions and wanted a building permit. A groundbreaking was reported in June 2026. Construction was expected to take about 14 months from its start. A neighboring 2.5-acre parcel may later be developed, possibly as a chain restaurant. No opposition was found.

What it could mean nearby

Where it stands

Township supervisors gave conditional approval in December 2025, and a groundbreaking was reported in June 2026. Next steps are construction, inspections and opening, which the developer expected about 14 months after construction starts. No later source confirming construction progress was found. Note: News reports describe a 97- or 98-room Marriott TownePlace Suites hotel, while the county summary gave no size and listed the project type only as institutional.

Who's behind it

Eagle Hospitality LLC (applicant), with owner Interchange Investment Group LLC and Lehighton Investment Group named as developer in the news · News reports describe an investment group behind the project. InnZenn Hospitality, named in the county filing, did not appear in the news coverage found.

Around the web

Planning terms explained
Land development plan
A detailed site plan showing buildings, parking, driveways and stormwater controls that the township must approve.
Minor subdivision
A small division of land into a few parcels, here splitting the hotel site from the rest of the property.
Waiver
Permission to depart from a specific township design rule, such as landscaping or driveway standards.
Development agreement
A contract between the developer and the township setting out the work the developer must do, usually backed by a bond.
Erosion and sediment control plan
A plan to keep soil from washing off the site during construction. The county conservation district reviews it.

Researched by AI from public sources on Nov 7, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Franklin Township supervisors made the approval decisions, and their public meetings are where residents can comment. With work under way, little further review is expected.

In Pennsylvania, Franklin Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Franklin Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.

Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →

More projects nearby

See everything nearby on a map →