Carbon County · Nesquehoning Borough · #4030
Carbon Node East land development, Nesquehoning
Nesquehoning Borough, PA · other
In short: Carbon Node East land development, Nesquehoning is a development project in Nesquehoning Borough, Carbon County, PA. As of November 24, 2026, it is approved according to web research. Latest record: Times News (Aug. 21, 2026) reports that work begins in 2027 if all DEP approvals are received, and the DEP hearing was held Aug. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.
Usually next: building and stormwater permits; site work often starts within 3 to 12 months.
About this project
A preliminary land development plan submitted by Kovatch Enterprises (owner) and Carbon Node East Development (developer). The agenda does not describe what is to be built, its size, or the existing site. The county tabled the plan so its engineer can complete review.
County recommendation: No position
Issues raised: Engineering review not yet complete, Lengthy discussion; concerns need to be addressed and mitigated
- Applicant
- Kovatch Enterprises, Inc. / Carbon Node East Development
- Plan type
- Preliminary land development
- Land use
- other
Project history
- 2025-11-18 · #4030 · Preliminary land development
Map pin is approximate.
The full picture AI research · Nov 24, 2026
Carbon Node East is a planned data center campus in Nesquehoning. A data center is a building full of computers that run websites and AI systems. The plan has four buildings with about 619,000 square feet of floor space on roughly 104 acres off Industrial Road in an industrial zone. Kovatch Enterprises owns the land. Keel Infrastructure, formerly Bitfarms, is the company behind the project and operates the nearby Panther Creek power plant.
The county planning commission recommended conditional rejection in April 2026, because the plan needed more work on sewer, stormwater, wetlands and site design. The borough later gave conditional approval of the preliminary plan. The state environmental agency (DEP) held a public hearing on Aug. 20, 2026 on its water and stormwater permits. Times News reports that work could start in 2027 if all DEP approvals come through, and could take up to 20 months. About 75 people attended an information session. The coverage found mentions one concern, about tree removal, and no organized opposition.
What it could mean nearby
- Times News reports about 400 construction jobs and about 350 permanent jobs.
- Stormwater would drain to Broad Run, Dennison Run and Nesquehoning Creek, and the DEP permits cover wetlands, so water protection is a main review issue.
- PPL Utilities would supply power, and the developer would pay for the needed infrastructure, according to Times News.
- Tree clearing on the site is a concern raised by a resident.
Where it stands
The borough has given conditional preliminary approval, so the local approvals are in hand. The state DEP stormwater and wetland permits are still pending, and DEP issued deficiency letters in July 2026. After those permits come final plan approval, building permits and construction, which is expected in 2027. Note: The county's Nov. 2025 summary did not describe the project, but later sources show it is a four-building, roughly 619,000-square-foot data center campus on about 104 acres, with Keel Infrastructure behind it.
- Sep 4, 2026 DEP written comment deadline (Times News gives Sept. 5)
- Aug 21, 2026 Times News reports work to begin in 2027 pending DEP approvals
- Aug 20, 2026 DEP public meeting and hearing at Panther Valley High School
- Jul 7, 2026 DEP technical deficiency letters on the permit applications
- Apr 21, 2026 County planning commission recommends conditional rejection
- Nov 18, 2025 County planning commission reviewed the preliminary plan and tabled it
Who's behind it
Carbon Node East Development, LLC (Keel Infrastructure, formerly Bitfarms) · Keel Infrastructure, formerly Bitfarms, is the company behind the project, and it operates the Panther Creek power plant next to the site.
Around the web
- Data center work to begin in 2027Times News · Aug 21, 2026Gives the 2027 start, 20-month build, job estimates and owner, and says the start depends on DEP approvals.
- DEP to host public meeting and hearing for Carbon Node East data centerPA Department of Environmental Protection · Aug 19, 2026Lists the pending Chapter 105 and NPDES stormwater permit applications and the Aug. 20 hearing.
- Nesquehoning data center plans need workTimes News · Apr 22, 2026Gives the plan size (four buildings, about 619,000 sq ft, about 104 acres), Kovatch's land ownership and the county's conditional rejection recommendation.
- Times News coverage of Nesquehoning borough action on Carbon Node EastTimes NewsSearch summary reports that borough council gave conditional approval of the preliminary plan; the page itself was not opened.
- Carbon County Planning CommissionCarbon County · Nov 18, 2025County record of the Nov. 18, 2025 review.
Planning terms explained
- Preliminary land development plan
- An early formal site plan that the borough and county review before final approval.
- NPDES permit
- A state permit that controls stormwater runoff leaving a construction site.
- Chapter 105 permit
- A state permit for work affecting streams and wetlands.
- Conditional approval
- Approval that depends on the developer fixing listed issues.
- Technical deficiency letter
- A regulator's notice that an application is missing information.
Researched by AI from public sources on Nov 24, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
How to comment officially
For this project: DEP decides the pending water and stormwater permits through its Northeast Regional Office, and the written comment period closed in early September 2026. Residents can still raise concerns with Nesquehoning Borough council at its public meetings.
In Pennsylvania, Nesquehoning Borough decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.
- Speak at the Nesquehoning Borough planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Nesquehoning Borough manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.
Find Nesquehoning Borough's meeting agendas →
Comments on this page are not sent to officials and are not part of the public record.
What neighbors think
Loading…
Scope estimate for contractors
Not enough detail to estimate.
Contractor or supplier? Get projects like this in the counties you work, by email. Get free contractor alerts →
More projects nearby
- Land development, Nesquehoning VFW Post 8008same area · recreation · Nesquehoning Borough · filed 2024-06-18
- Minor subdivision in Nesquehoning Boroughsame area · single-family homes · Nesquehoning Borough · filed 2025-09-16
- Minor subdivision/lot combination, Nesquehoningsame area · lot line change · Nesquehoning Borough · filed 2026-08-18
- Land development in Nesquehoning Boroughsame area · other · Nesquehoning Borough · filed 2026-04-21
- Minor subdivision/lot combination, Nesquehoningsame area · lot line change · Nesquehoning Borough · filed 2026-08-18
- Minor subdivision/lot line adjustment (Nesquehoning)same area · lot line change · Nesquehoning Borough · filed 2026-10-20