Eagle Hospitality land development, Franklin Twp

Franklin Township, PA · institutional

In short: Eagle Hospitality land development, Franklin Twp is an institutional project in Franklin Township, Carbon County, PA. As of November 24, 2026, it is under construction according to web research. Latest record: The Times News of June 3, 2026 reports the groundbreaking at 1055 Interchange Road and says completion is expected within about 14 months of construction… What usually happens next: completion and occupancy.

Under construction The Times News of June 3, 2026 reports the groundbreaking at 1055 Interchange Road and says completion is expected within about 14 months of construction starting. · web research checked Nov 17, 2026 · source AI research
  1. Proposed
  2. In reviewMar 2025
  3. Approved
  4. Permitted
  5. Under construction
  6. Completed

Usually next: completion and occupancy.

About this project

A land development plan by Eagle Hospitality, LLC in Franklin Township, reviewed by the county as part of a PA DEP NPDES Chapter 102 erosion and sediment control permit. The agenda does not give the size, planned uses, or current site conditions.

Applicant
Eagle Hospitality, LLC
Plan type
Land development plan (NPDES Chapter 102 review)
Land use
other

Project history

  • 2025-03-18 · #2025-03-eagle-hospitality-land-development-frank · Land development plan (NPDES Chapter 102 review)

County plan review office →

Map pin is approximate.

The full picture AI research · Nov 17, 2026

Eagle Hospitality, LLC is building a Marriott TownePlace Suites, an extended-stay hotel, at 1055 Interchange Road in Franklin Township. The site is the former Jimmy's Gym property, near the Turnpike exit. County and news reports describe a four-story building of about 17,225 square feet. Room counts differ by report: early plans said 97 rooms, and the June 2026 groundbreaking article said 98. It will have a pool and kitchenettes.

The hotel will sit on about 6.3 acres of a 9-acre parcel. The developer said the neighboring 2.5 acres could later hold a chain restaurant.

The county planning commission recommended conditional approval. Township supervisors then approved waivers in November 2025 and gave conditional approval in December 2025. A groundbreaking ceremony was reported in June 2026, with about 14 months of construction expected. Two other hotels are already within a mile.

What it could mean nearby

Where it stands

Township supervisors gave conditional approval in December 2025, and a groundbreaking was held, reported on June 3, 2026. Construction is expected to take about 14 months, so opening would be around mid-to-late 2027. No later source showing the hotel finished or open was found. Note: Sources differ on the details: early reports say 97 rooms and four stories, while the May 2025 plans and a December 2025 article say three stories, and the June 2026 article says 98 rooms. The county record also gives no use or size, though news reports show it is a hotel, not retail.

Who's behind it

Eagle Hospitality, LLC · The company is the applicant for a TownePlace Suites hotel. Coverage links it to Interchange Investment Group LLC of Bethlehem, which bought the parcel in 2019. No official company website was found.

Around the web

Planning terms explained
Land development plan
A detailed site plan for a new building, with its parking, access drives and utilities, that the township reviews.
NPDES Chapter 102 permit
A state stormwater and erosion-control permit required for sites that disturb a large area of ground.
Conditional approval
Approval that depends on the developer completing listed items, such as agreements and water service.
Waiver
Permission to depart from a specific township design rule, such as for landscaping or parking.
Erosion and sediment control plan
A plan to keep soil and runoff from leaving the site during construction.

Researched by AI from public sources on Nov 17, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

How to comment officially

For this project: The Franklin Township supervisors handle local approvals at their public meetings, and the Carbon County Conservation District must approve the erosion and sediment plan.

In Pennsylvania, Franklin Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

Find Franklin Township's meeting agendas →

Comments on this page are not sent to officials and are not part of the public record.

What neighbors think

Loading…

Scope estimate for contractors

Not enough detail to estimate.