Chester County · West Nantmeal Township · #SD-10-25-18699
7-lot subdivision on Fairview Road
West Nantmeal Township, PA · 7 homes, single-family homes · 47.9 acres
About this project
Revised plan to divide a 47.9-acre lot into seven lots, with seven single-family homes and open space, in West Nantmeal Township.
Official description: 1 lot into 7 lots, 7 SFR and open space proposed. Description by Applicant: Revision to a prior proposal
- Plan type
- Subdivision
- Land use
- Single Family Residential
- Status
- Reviewed
The full picture AI research · Nov 1, 2026
A revised plan has been filed with Chester County to divide one 47.9-acre property on Fairview Road in West Nantmeal Township into seven lots. Each lot would get a single-family home, for seven new homes in total. The plan also sets aside open space.
The county records do not say what is on the land now. At about 6.8 acres per home on average, the density is low, and much of the land would probably stay open or undeveloped.
Web searches found no news coverage, township agendas or minutes, developer page or permit records tied to this project. Nothing is known online about opposition, approvals or who will build the homes. The results that came up were for a different township (East Nantmeal) and were not used.
What it could mean nearby
- Seven new households would add a modest amount of traffic to Fairview Road. No traffic study was found.
- The plan includes open space, but the records do not say how much or whether it would be permanently protected.
- New homes would add a small number of students to the local school district. The records give no figures.
- Water and sewage service for the homes is not described in the records found.
Where it stands
A revised plan was filed with the county on 2025-11-03, so the subdivision is under review and has not been shown to be approved. Next, the township planning commission and supervisors usually review it. They then vote to approve it, approve it with conditions, or deny it.
- Nov 3, 2025 Latest county filing of the revised seven-lot subdivision plan
Want to weigh in? The West Nantmeal Township Board of Supervisors normally decides on subdivisions after the planning commission reviews them. Residents can usually comment at public meetings, and the township office can confirm the schedule.
Planning terms explained
- Subdivision
- Dividing one piece of land into separate lots that can be sold or built on.
- Revised plan
- An updated version of a plan submitted earlier, often after reviewers asked for changes.
- Open space
- Land in a development kept free of buildings, such as meadows, woods or trails.
- Planning commission
- A local advisory board that reviews development plans and recommends action to elected officials.
We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $3.9M
- ~224 roofing squares
- ~7 HVAC systems
- ~7 kitchens / 14+ bathrooms
- ~19,600 sq ft of finished living space