Chester County · East Marlborough Township · #LD-05-24-18098
Riepe Center for Advanced Veterinary Education
East Marlborough Township, PA · 11,835 sq ft non-residential, institutional · 213.0 acres
About this project
Land development in East Marlborough Township for a new 11,835 sq ft educational building on a 213-acre site.
Official description: Riepe Center (New Building)
- Plan type
- Land development
- Land use
- Educational Facility,
- Status
- Reviewed
Filing history
- 2024-05-22 · #LD-05-24-18098 · Land development · 11,835 sq ft
The full picture AI research · Nov 1, 2026
The Riepe Center is a new education building at Penn Vet's New Bolton Center. This is the University of Pennsylvania veterinary school's large-animal hospital and campus in East Marlborough Township, near Kennett Square. County records list an 11,835 sq ft building on a site of about 213 acres. Public sources describe a building of about 11,800 sq ft.
It is the campus's first building made only for classes. It has two wings around an outdoor courtyard. One wing holds classrooms and gathering areas. The other holds a simulation lab where students practice large-animal skills. Penn Vet students, faculty, residents and outreach programs will use it.
The site is an existing working veterinary campus with hospital buildings and farmland. Groundbreaking was April 30, 2025. A local news report in September 2026 said it was expected to open for students in fall 2026. No opposition was found online.
What it could mean nearby
- The building is small and sits on an existing campus, so any new traffic is likely modest. No traffic study was found.
- The records show no new homes. Jobs would mostly be construction during the build, plus teaching and training activity afterward.
- The site stays within a large, mostly open campus. The records show no new public road or utility extension.
- Outreach programs may bring farmers, alumni and community members to the campus for events and training.
Where it stands
The project appears to be built or nearly done. The latest county filing was May 2024, and construction began in April 2025. A local report in September 2026 expected students to start using it in fall 2026. The remaining steps are final inspections, occupancy approval and the opening.
- Sep 2026 Local news report expected the center to open for students in fall 2026
- Apr 30, 2025 Groundbreaking held at New Bolton Center
- May 22, 2024 Latest county planning filing for the land development
Want to weigh in? The township's records show no pending decision for this project, so comment is unlikely to be needed. East Marlborough Township supervisors and planning commission handle land-development reviews, and their public meetings are the place to raise concerns about future campus work.
Who's behind it
University of Pennsylvania School of Veterinary Medicine (Penn Vet) · Penn Vet is the university's veterinary school, which runs teaching, research and animal hospitals at its Philadelphia and New Bolton Center campuses. KSS Architects designed the building and Gardner/Fox was the contractor, per local news.
Around the web
- Penn Vet Adds $17 Million Training Center at New BoltonMyChesCo · Sep 11, 2026Describes the two-wing building, its $17 million cost, the architect and contractor, and the expected fall 2026 student opening.
- Penn breaks ground on the Gail P. Riepe Center for Advanced Veterinary EducationPenn Today · May 4, 2025Reports the groundbreaking, the building's purpose and its intended users.
- Gail P. Riepe Center for Advanced Veterinary Education GroundbreakingUniversity of Pennsylvania Office of the President · Apr 30, 2025Gives the April 30, 2025 groundbreaking date.
- Gail P. Riepe Center for Advanced Veterinary EducationPenn FacilitiesUniversity facilities listing for the building.
Planning terms explained
- Land development
- A formal township review of a building project's site layout, stormwater, access and utilities, even where no new lots are created.
- Institutional
- A use that serves a school, university, hospital or similar public-purpose organization rather than housing or retail.
- Non-residential square footage
- The total floor area of buildings that are not homes.
- Simulation lab
- A training room where students practice clinical skills on lifelike models before working with live animals.
Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.
Scope estimate for contractors
Estimated construction value: $4.1M
- ~59 roofing squares (assumes 2 stories)
- ~29 tons of cooling (rule of thumb 400 sq ft/ton)