PlannedNearby

Chester County · West Sadsbury Township · #LD-05-25-18532

JD Eckman Inc. Truck Garage Land Development

West Sadsbury Township, PA · 24,000 sq ft non-residential, industrial · 38.4 acres

About this project

A preliminary/final land development plan for a 24,000 sq ft truck garage with parking and stormwater facilities on about 38 acres in West Sadsbury Township.

Official description: 24,000 SF Proposed truck garage, parking lot and stormwater

Plan type
Land development
Land use
Parking Lot/Garage
Status
Reviewed

Filing history

  • 2025-06-24 · #LD-05-25-18532 · Land development · 24,000 sq ft

County plan review office →

The full picture AI research · Nov 1, 2026

A trucking-related business, JD Eckman Inc., has proposed a 24,000 square foot truck garage in West Sadsbury Township, Chester County. The building would be industrial, with parking and stormwater facilities (basins and pipes that manage rain runoff). It would sit on a site of about 38 acres. That is a large lot for a building this size, so most of the land would likely stay undeveloped.

The county record describes a combined preliminary/final land development plan. This means the township is asked to review the design and give final approval in a single step. The records do not say what currently occupies the site, though the size and township location suggest farmland or open land.

No news coverage, developer project page, or official township agenda or minutes could be clearly matched to this project. Nothing was found about opposition, approvals, or who would occupy the building.

What it could mean nearby

Where it stands

The latest county filing, dated 2025-06-24, shows the plan under review. The township supervisors usually act next, after advice from the township and county planning commissions and engineering review. Approval often comes with conditions, followed by plan recording and permits before construction.

Want to weigh in? The West Sadsbury Township Board of Supervisors would normally decide on the plan, and residents can usually comment at its public meetings or by writing to the township office.

Who's behind it

JD Eckman Inc.

Planning terms explained
Land development plan
A detailed site plan showing buildings, parking, driveways and utilities that a township must approve before construction.
Preliminary/final plan
A combined review in which the township considers both the early and the final design in a single approval step.
Stormwater facilities
Basins, pipes and similar features that collect and slow rain runoff from paved and roofed areas.
Industrial use
A zoning category for activities such as vehicle storage, repair, manufacturing and warehousing.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 1, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

Scope estimate for contractors

Estimated construction value: $3.1M

Contractor or supplier? Get projects like this in the counties you work, by email. Join contractor early access →