# Changes Day Salon and Med Day Spa

Hampden Township, PA · 6,447 sq ft non-residential, government & utilities

In short: **Changes Day Salon and Med Day Spa** is a government or utility project in Hampden Township, Cumberland County, PA. It would add 6,447 sq ft of non-residential space. Its estimated construction value is about $1.3M, a rough estimate from its size. As of November 24, 2026, it is approved. Latest record: Township project list: preliminary/final land development review, approved. What usually happens next: building and stormwater permits; site work often starts within 3 to 12 months.

Stage: Approved · Township project list: preliminary/final land development review, approved · [source](https://www.hampdentownship.us/government/planning_commission/current_plans_and_proposed_text_amendments.php)

Usually next: building and stormwater permits; site work often starts within 3 to 12 months.

## About this project

A building addition of about 6,450 square feet and a reconfigured parking lot for the Changes Day Salon and Med Day Spa in Hampden Township, including grading and stormwater work.

Official description: Construct a 6,452 SF building addition and reconfigure the parking lot. Plan includes grading and stormwater management.

- **Plan type:** Preliminary/final subdivision & land development plan: county review report

## Project history

- **2026-11-07** · Township project list · Preliminary/final land development review · **Approved** · [source](https://www.hampdentownship.us/government/planning_commission/current_plans_and_proposed_text_amendments.php)
- **2026-11-02** · Township project list · Preliminary/final land development plan · **Approved** · [source](https://www.hampdentownship.us/government/planning_commission/current_plans_and_proposed_text_amendments.php)
- **2026-01-20** · Deed transferred to 5121 East Trindle Associates LLC (no sale price recorded) · Cumberland County parcel records
- **2024-12-05** · Board of Commissioners · Plan time extension · [source](https://www.hampdentownship.us/Government/board%20of%20commissioners/agendas%20and%20minutes/2024/12.5.24%20mtg%20minutes.pdf?t=202501080818070)
- **2024-07-15** · #2884 · Preliminary/final subdivision & land development plan: county review report · 6,447 sq ft

[County review letter →](https://www.cumberlandcountypa.gov/DocumentCenter/View/51746/Changes-Day-Salon-and-Med-Day-Spa-PF-SDLD-Review-Report-2024-07-15)

[County plan review office →](https://www.cumberlandcountypa.gov/5139/Subdivision-Land-Development-Activity-Ma)

## The full picture AI research · Nov 4, 2026

The county records describe an addition of about 6,450 square feet to the Changes Day Salon and Med Day Spa in Hampden Township, Cumberland County. The plan also reworks the parking lot and includes grading and stormwater work. Stormwater work manages rainwater runoff from the new roof and paving.

The salon and spa already operates in the township, so this would expand an existing business rather than bring in a new one. A business directory lists a Changes Salon and Day Spa on East Trindle Road, but it doesn't confirm that this is the site of the project.

The township's project list shows the preliminary/final land development plan as approved on 2026-11-02. No news coverage, opposition, builder page, permit or construction notice was found online.

### What it could mean nearby

- The parking lot will be reconfigured, which could change how cars enter, exit and park on site.
- The grading and stormwater work is meant to handle runoff from the added building and paving.
- An expanded spa and salon may add some local jobs, but no source states staffing numbers.

### Where it stands

The township project list shows the combined preliminary/final land development plan as approved on 2026-11-02. Building permits and construction usually follow, once any approval conditions and stormwater requirements are met.

- **Nov 2, 2026** Township project list shows the preliminary/final land development plan approved
- **Jul 15, 2024** Latest county filing for the project

Planning terms explained

- **Land development plan:** A detailed site plan showing a new or expanded building, parking, grading and utilities, which the township must approve.
- **Preliminary/final plan:** A single review that combines the early and last approval steps, often used for smaller projects.
- **Grading:** Reshaping the land's surface so the building sits properly and water drains correctly.
- **Stormwater management:** Features such as basins or pipes that control rainwater runoff from roofs and pavement.

We searched the web for this project but found nothing beyond the county record, so this explanation is based on the filing alone. Researched by AI from public sources on Nov 4, 2026. It can make mistakes, so check the linked sources and the municipality before relying on it.

## How to comment officially

**For this project:** The approval is already recorded, so remaining steps are mostly administrative; residents can ask the Hampden Township planning and zoning office about permits or conditions.

In Pennsylvania, Hampden Township decides on this plan, not the county. The county planning commission only reviews it and sends recommendations.

- Speak at the Hampden Township planning commission or governing body (board of supervisors or council) meeting when the plan is on the agenda. Public comment there goes on the official record.
- Or email or mail a written comment to the Hampden Township manager or zoning officer, name the plan and its address, and ask that your comment be entered into the record.

[Find Hampden Township's meeting agendas →](https://www.google.com/search?q=Hampden+Township+PA+planning+commission+meeting+agenda)

Comments on this page are not sent to officials and are not part of the public record.

## Scope estimate for contractors

Estimated construction value: **$1.3M**

- ~64 roofing squares (assumes 1 story)
- ~16 tons of cooling (rule of thumb 400 sq ft/ton)

**Contractor or supplier?** Get projects like this in the counties you work, by email. [Get free contractor alerts →](https://plannednearby.com/contractors)

## More projects nearby

- [5117 E. Trindle Road](https://plannednearby.com/x/cumberland-5117-e-trindle-road) — under 0.1 mi · 20,000 sq ft non-residential, retail & commercial · Hampden Township · filed 2025-10-21
- [The Residences on Trindle](https://plannednearby.com/x/cumberland-the-residences-on-trindle) — 0.2 mi · 61 homes, apartments · Hampden Township · filed 2024-08-16
- [Sporting Hill Apartments](https://plannednearby.com/x/cumberland-sporting-hill-apartments) — 0.6 mi · 11 homes, 3,944 sq ft non-residential, mixed use · Hampden Township · filed 2026-11-17
- [950 Woodland Investments, LLC](https://plannednearby.com/x/cumberland-950-woodland-investments-llc) — 1.1 mi · lot line change · Lower Allen Township · filed 2024-03-26
- [960 Century Drive](https://plannednearby.com/x/cumberland-960-century-drive) — 1.1 mi · lot line change · Lower Allen Township · filed 2025-10-21
- [Wawa Store No. 8256 - 920 Century Drive](https://plannednearby.com/x/cumberland-wawa-store-no-8256-920-century-drive) — 1.1 mi · 6,050 sq ft non-residential, retail & commercial · Lower Allen Township · filed 2025-04-29

[See everything nearby on a map →](https://plannednearby.com/near#40.22425,-76.97653,Hampden%20Township)

---

Source page: https://plannednearby.com/x/cumberland-2884

Data from public planning, zoning and permit records in Pennsylvania, New Jersey and Delaware: county planning commissions, Philadelphia permits and zoning appeals, New Jersey construction permits, Delaware's Preliminary Land Use Service (PLUS) and Pennsylvania DEP stormwater permits, processed automatically. Summaries are written by AI from those records. Estimates are rough order-of-magnitude and not engineering figures. Always verify with the municipality. Not affiliated with any county or state agency. Map data © OpenStreetMap contributors.